Prepare - 31
SK750/SK755 Operator’s Manual
Gather Information
CMW
Gather Information
A successful job begins before you start working. The first step in planning is reviewing information already
available about the job and jobsite.
All Jobs
Review Job Plan
Review blueprints or other plans. Check for information about existing or planned structures, elevations, or
proposed work that may be taking place at the same time.
Arrange for Traffic Control
If working near a road or other traffic area, contact local authorities about safety procedures and
regulations.
Plan for Emergency Services
Have the telephone numbers for local emergency and medical facilities on hand. Check that you will have
access to a telephone.
Ground-Penetrating Jobs
Notify One-Call Services
Contact your local One-Call (811 in USA) or the One-Call referral number (888-258-0808 in USA and
Canada) to have underground utilities located before digging. Also contact any utilities that do not
participate in the One-Call service.
Above-Ground Jobs
Locate Overhead Lines
Note location and height of all overhead lines in jobsite and ensure that fully lifted attachment and/or load
will not touch lines.
Содержание SK750
Страница 1: ...SK750 SK755 Operator s Manual 053 2570 Issue 1 0 Original Translation CMW...
Страница 11: ...Contents 11 SK750 SK755 Operator s Manual CMW...
Страница 21: ...Safety 21 SK750 SK755 Operator s Manual Emergency Procedures CMW...
Страница 38: ...SK750 SK755 Operator s Manual Drive 38 CMW Drive Chapter Contents Start Unit 39 Drive 39 Shut Down 41...
Страница 49: ...Transport 49 SK750 SK755 Operator s Manual Tow CMW...
Страница 73: ...Service 73 SK750 SK755 Operator s Manual As Needed CMW...
Страница 80: ......
Страница 81: ......
Страница 82: ...SK750 SK755 Operator s Manual Service Record 82 CMW Service Record Service Performed Date Hours...
Страница 83: ...CMW Service Record 83 SK750 SK755 Operator s Manual Service Performed Date Hours...