B-7
Procedures to hoist and lower the machine (Continued)
Step No.
Procedure
4
Thread the dedicated slings through the shackles and then attach the shackles to the
machine as shown in the figure below.
・
For the machine front, use 2 shackles at each side.
[Machine front view]
Sling (B)
Sling (A)
Hosting jig
Shackle (A)
Shackle (B)
Hook
Shackle (A)
Hook
< Detailed drawing of shackle
mounting >
Screw in the
retaining screw
to secure the
shackle
[Machine side view]
Sling (B)
Sling (A)
Hosting jig
Shackle (B)
Shackle (A)
Hook (rear)
Shackle (B)
Hook (front)