B-31
1-6-4. Connection of Power Cable of Duct Unit [Optional Accessory]
Equipment you must have ready
Phillips screwdriver
Slotted screwdriver
Procedures to connect the power cable of the duct unit to the machine
Step No.
Procedure
(Continued from the previous section)
1
Connect the PE line of the duct unit power cable to the earth bar located at the bottom part
of the control box.
Earth bar
(Terminal for connection)
E: No. 14
2
Connect each power line of the duct unit power cable to the corresponding terminals on
the terminal block (TB2).
・
Make sure to connect each line to its terminal correctly referring to the following figure.
Terminal block (TB2)
(Terminals for connection)
L1: No.12
L2: No.13
L3: No.14
Continued in the next section.