B-41
1-11. Wheel Coolant and Spindle Coolant Water Supply
Water supply procedures
Step No.
Procedure
(Continued from the previous section)
1
Unlock the wheel coolant water and spindle coolant water valves at the plant facility side.
2
Open the water valves (wheel coolant water and spindle coolant water).
Continued in the next section.
1-12. Power Supply
Power supply procedures
WARNING
Before starting the work described here, make sure that power supply at the
plant facility side is shut OFF and locked out
If you come into contact with a live part of the machine while the facility-side power
is turned ON, you may receive an electric shock that could result in severe injury or
death.
Step No.
Procedure
(Continued from the previous section)
1
Check to make sure that the facility-side power is shut OFF.
2
Check to make sure that all the circuit breaker switches in the control box (rear) are turned
ON.
3
Check to make sure that all EMO switches (2 places) of the machine are released.
→
Refer to Section 3 [Emergency OFF Switch (EMO Switch)] in Safety Manual for
details of the EMO switches.
4
Turn ON the facility-side power.
Continued in the next section.