B-12
1-3. Leveling the Machine
Equipment you must have ready
Level gauge (Minimum calibration: 20
μ
m/m)
Adjustable wrench
Procedures to level the machine
NOTICE
Gently place the level gauge at its designated position in the machine
If the level gauge installing surface is flawed, it may adversely affect the machine's
grinding accuracy.
Step No.
Procedure
(Continued from the previous section)
1
Check to make sure that there is no dust or any other dirt observed on the level gauge
installation surface.
2
Place the level gauge (for right/left leveling) at its designated position in the machine.
Level gauge
installation surface
Level gauge
(for right/left leveling)
Level gauge
(for front/rear leveling)
[View on machine left side]