This chapter defines step by step how to start up with the extinguishing panel correctly.
5.1- System check
Before handling any other part of the system, please
verify the solenoid is disconnected from the bottle.
Before connecting the mains supply check the points listed below carefully:
•
Check that the equipment has been installed correctly.
•
With the help of a voltmeter to verify that there are no short or open circuits in the
zone lines, sounders, bottle output, sign, state 1, state 2, manual buttons and bottle
and door surveillances, verify also they have 4K7 end of line resistors.
•
Verify that the sounder circuits, sign circuit, state 1 and state 2 are connected with
the correct polarity.
•
Verify that the bottle output line is connected respecting the polarity and ensure it has
the end-of-line module.
•
Set the desired delay for the sounders.
•
Set the desired delay for the bottles triggering.
•
Set the desired operation mode.
Check that the mains voltage is 230V using a voltmeter and check that batteries have
a voltage of more than 24V.
5.2- System Supply
After reviewing all the points described above, the correct order to connect the power
is:
•
Connect the mains power supply.
•
Connect the batteries.
If necessary, you can turn the panel on with only the battery connected, but it is
essential to press BAT to start the panel.
Once both power supplies are connected all the panel indicators should be turned off
except the green power LED. If you have programmed a sounder delay, you should
also see the sounder delay LED on.
If you notice any indication other than those described above, the origin of the problem
in the installation should be detected and the fault repaired before proceeding (see
problems).
Содержание CCD-103
Страница 1: ...GB ES ES GUIDE MANUAL FR 3 Zones Conventional fire extinguishant control panel IT ...
Страница 2: ......
Страница 3: ...ES ES Central Convencional de 3 Zonas de detección y 1 Extinción MANUAL DEL USUARIO ...
Страница 4: ......
Страница 6: ......
Страница 14: ...12 ES 4 Guía de conexionado de la PCB ...
Страница 44: ......
Страница 45: ...GB GUIDE MANUAL 3 Zones Conventional fire extinguishant control panel ...
Страница 46: ......
Страница 48: ......
Страница 56: ...12 GB 4 PCB connection guide ...
Страница 86: ......
Страница 87: ...FR FR Centrale conventionnelle à 3 zones de détection et 1 zone d extinction MODE D EMPLOI ...
Страница 88: ......
Страница 90: ......
Страница 98: ...FR 12 4 Guide de branchement de la PCB carte de circuit imprimé ...
Страница 128: ......
Страница 129: ...IT Central Convencional de 3 Zonas de detección y 1 Extinción MANUAL UTENTE ...
Страница 130: ......
Страница 132: ......
Страница 140: ...12 IT 4 Guía de conexionado de la PCB ...
Страница 170: ...55310300 2014 10 14 ...