Start-Up and Maintenance Procedures
Read this section thoroughly before attempting to commission the Desert Aire dehumidifier. A complete
start-up will minimize operational problems and expensive callbacks. The start-up will be quicker and easier if
there is a heat and humidity load present in the space. Energize any auxiliary air and pool water
heaters before the start-up so that the air and water are at their design temperatures.
Crankcase heater
should be energized for 24 hours before refrigeration system is allowed to operate.
3.1 Preliminary Inspection
Verify that all contractors have completed their work. Find the Desert Aire “SP Start-Up Report”, which is
located near the back of this manual. You must fill out the start-up report to validate the dehumidifier warranty.
Check the following items:
• Before starting unit, remove wooden shipping blocks found beneath compressor(s).
• Before starting unit, remove restraining brackets on supply blower equipped with the spring
isolation base, if applicable.
• Verify that the incoming power supply matches the rating plate of the dehumidifier. The fused
disconnect and the power supply wiring must be rated to handle the minimum ampacity rating
printed on the rating plate.
• With the power supply disconnected and locked, tighten all field and factory wiring.
• Check for proper phasing of the compressors per Section 2.7.
• Check for proper phasing of the optional remote condenser power supply. The head fan has an
EC motor and will not need to be phased; however, additional fans (2nd, 3rd, 4th, etc) should be
phased. Test the phasing by “bumping” the blower contactor. Verify that the blower rotates in the
proper direction. If it rotates the wrong direction, switch any two of the three wires at the power
block. The fans will blow air vertically upward when they are phased correctly.
• Inspect the air filters in the dehumidifier. Replace them if necessary.
• Check the pool water piping on units equipped with the water heating option. Inspect for leaks and
proper installation of components. Verify that the auxiliary pump operates, if one is used. Purge all
air out of the pool water piping.
• Check the heating control valve and piping on dehumidifiers equipped with an optional hot water
or steam heating coil.
• Verify that all sensors are installed and operating properly. Verify that all external wiring to
dampers, exhaust blowers, auxiliary heaters, etc. is properly connected.
• Slowly open all refrigerant service valves, and tighten the valve stem packing nuts.
• Check the field and factory piping for leaks. The internal piping may have been damaged during
shipping.
3.2 Airflow Balancing
To ensure code compliance and long equipment service life, proper airflow must be verified by a qualified air
balancer. Before you balance the airflow, locate the motor control switches located in the electrical
compartment of the dehumidifier.
Содержание SelectAire Plus SP Series
Страница 2: ...2 ...
Страница 12: ...12 Desert Aire SP Manual ...
Страница 76: ...76 Figure 41 Filter Drier Assembly Desert Aire SP Manual ...
Страница 101: ...101 Desert Aire SP Manual ...
Страница 102: ...102 Desert Aire SP Manual ...
Страница 103: ...103 Desert Aire SP Manual ...
Страница 104: ...104 Desert Aire SP Manual ...
Страница 105: ...105 Desert Aire SP Manual ...
Страница 106: ...106 Desert Aire SP Manual ...
Страница 109: ...109 Desert Aire SP Manual ...