• Connect this furnace to an approved vent system only. Combustion products must be vented
outdoors.
• Use a soap-bubble solution or an electronic detector to check for gas leaks. Never use a lighter or
open flame to find leaks.
• The return air duct of the furnace must be sealed air tight to prevent starvation of the combustion
air, especially if the furnace is located in a closet or confined area.
• Because of the potential of odorant fade, a gas leak may not be detected by smell. If this
equipment is installed below grade, contact your gas supplier for a gas detector.
• Maximum gross stack temperature must not exceed 480°F (249°C) under any circumstances.
• Care must be taken not to wet electronic components during leak test. Wetting the electronic
components may damage circuitry and cause a hazardous situation. Dry moisture from all leads
and terminals if minor wetting occurs. Wait at least 24 hours for the circuit to fully dry before
energizing the burner circuit.
• The gas burner and its individual gas shutoff valve must be disconnected from the gas supply
during pressure testing of the gas supply system at pressures in excess of 0.5 psig (14.0” w.c.).
• Copper and brass tubing and fittings (except tin lined) shall not be used if the gas contains more
than a trace (0.3 grains per 100 cubic ft.) of hydrogen sulfide gas. Check with your gas supplier.
• For initial start-up of the furnace after installation, it may be necessary to purge the air out of the
gas line. This should be done by a qualified heating contractor. If excessive gas escapes when
purging the gas supply at the union, allow the area to ventilate for at least 15 minutes before
attempting to start the furnace. LP gas is especially dangerous because it is heavier than
air and may accumulate to a dangerous concentration at the floor level.
2.10.2 Gas Piping
Gas supply piping installation should conform with good practice and to national and local codes. The orifice
for the burners are sized for either natural gas (having a heating value of 1025 BTU per cubic foot and a
specific gravity of 0.60) or for liquefied propane gas (with a heating value of 2500 BTU per cubic foot and a
specific gravity of 1.53). If the gas at the installation does not meet this specification, consult the factory for
proper orifice sizing.
Seal the opening for the gas supply pipe with the grommet provided
Supply lines must be sized based on pressure drop and capacity. Gas piping must be large enough to provide
adequate gas with minimal pressure drop. Use the table below as a guide to capacity. Note that each gas
heat module in a SelectAire Plus™
unit will have an independent connection. Ensure that any branch
connection is also properly sized for a minimal pressure drop.
Содержание SelectAire Plus SP Series
Страница 2: ...2 ...
Страница 12: ...12 Desert Aire SP Manual ...
Страница 76: ...76 Figure 41 Filter Drier Assembly Desert Aire SP Manual ...
Страница 101: ...101 Desert Aire SP Manual ...
Страница 102: ...102 Desert Aire SP Manual ...
Страница 103: ...103 Desert Aire SP Manual ...
Страница 104: ...104 Desert Aire SP Manual ...
Страница 105: ...105 Desert Aire SP Manual ...
Страница 106: ...106 Desert Aire SP Manual ...
Страница 109: ...109 Desert Aire SP Manual ...