InfraSuite R Series – Air Cooled Type
18
3.1.2 Handling
Before moving the equipment to the installation site, plan the route according to the following
instructions:
1. Make sure the passage, floor, elevator or slope on the handling route can bear the weight
of the equipment and handling device, and there is sufficient space to avoid collisions.
2. In the case of a slope on the handling route, its inclination must not be greater than 15
degrees so as to avoid toppling the cabinet.
3. The bottom casters are only suitable for short distance movement. For long distance
movement, use a handling device so as to avoid damage to the casters.
4. The casters are only suitable for moving on flat surfaces. Avoid heavy falling off and
moving of the unit on uneven ground since they may damage the casters or even result
in toppling.
5. When moving the unit, pay attention to its height and center of gravity. A minimum of two
people should work together to handle the unit so as to guarantee safety.
Содержание InfraSuite RDA037
Страница 11: ...11 Unit inch Figure 2 4 Outdoor Unit Appearance and Dimensions...
Страница 63: ...63 5 5 2 Data History Path Main Page Measurement Data History...
Страница 64: ...InfraSuite R Series Air Cooled Type 64 5 5 3 Warning Path Main Page Maintenance Warning...
Страница 65: ...65 5 5 4 Historical Event Path Main Page Maintenance Historical Event...
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 92: ...5013295900...