Chapter 12 Descriptions of Parameter Settings | IED-S
12-13-11
Speed Control Timing Diagram – IM Direct Docking
○
1
Door closes, elevator begins to run, and
operation contactor and STO are ON
○
2
STO activation completed
○
3
Drive outputs, starting zero-speed begins
○
4
Brake contactor is ON
○
5
Starting zero-speed ends, and
acceleration begins
○
6
Decelerates to zero speed, and
stopping zero-speed begins
○
7
Brake contactor is OFF
○
8
Stopping zero-speed ends, and
decreasing torque at stop begins
○
9
Decreasing torque at stop ends,
and drive stops outputting
○
10
Pr.13-57 (Time for Decreasing Torque at Stop) is time that
triple rated current decreases to zero. The current of
stopping zero-speed is lower so it usually decreases to zero
in advance.
○
11
Operation contactor and STO are OFF
○
12
STO deactivation completed, and operation ends
○
13
Door begins to open
Suggested Setting Value:
Pr.03-18 (0.200 sec.) Delayed Time for
Leveling Switch
Pr.04-09 (1.5 m/s
2
) Inspection Deceleration
Pr.04-10 (0.2 m/s
2
) Inspection Acceleration
Pr.04-11 (0.1 m/s
2
) Re-leveling Deceleration
Pr.05-25 (0.5 sec.) Door Open Delayed Time at Stop
Pr.13-42 (0.1 sec.) IM Mechanical Brake Release Delay
Time / PM Position Control Delay Time
Pr.13-43 (0.2 sec.) Mechanical Brake Engage Delay Time
Pr.13-44 (0.01 sec.) Drive Output Delay Time
Pr.13-45 (0.01 sec.) Operation
Contactor Off Delay Time
Pr.13-54 (0.4 sec.) Zero Speed
Activation Time
Pr.13-55 (0.5 sec.) Zero Speed
Stopping Time
Pr.13-57 (0.0 sec.) Time for
Decreasing Torque at Stop
Methods of Accurate
Leveling for Direct
Docking:
1. Executes hoistway
auto-tuning
2. Executes upper and lower
re-leveling for each floor to
make leveling accurate.
3. Executes hoistway
auto-tuning again. Pr.04-03
(Hoistway Auto-tuning Speed)
should not be larger than 0.2
m/s.
NOTE:
1. If elevator starts with a jerk when brake releases, set Pr.13-54 (Zero Speed Activation Time) to 2.0 seconds,
and increase Pr.13-31 (Zero Speed at Start-up Bandwidth). Note that a too large Pr.13-31 value would cause
a jerk when elevator starts. It is suggested to increase Pr.13-31 to a value that elevator slightly shakes when
starting at top or bottom floor. Then, set Pr.13-31 = [(Pr.13-31 setting value -1) x 0.9], and set Pr.13-54 to
initial settings. In principle, set Pr.13-31 as large as possible, but cannot be too large that causes a jerk when
elevator starts. If jerk still occurs when brake releases, you can adjust Pr.13-44 (Drive Output Delay Time),
Pr.13-54 (Zero Speed Activation Time), and Pr.13-42 (IM Mechanical Brake Release Delay Time).
2. If brake engaged speed is slower, it may cause stopping zero-speed has already ended before brake
engages, further making motor run after stop and a jerk at stop occurs. In this case, set Pr.13-43 (Mechanical
Brake Engage Delay Time) to 0 first. If this problem still occurs, set Pr.13-55 (Zero Speed Stopping Time) to a
larger value.
3. If main motor starts to vibrate after brake is fully engaged, set Pr.13-57 (Time for Decreasing Torque at Stop)
to 5 seconds. If vibration reduces, change Pr.13-57 to a proper value. The larger the Pr.13-57 setting value,
the slower the elevator opens its door.
Содержание IED-S Series
Страница 3: ......
Страница 10: ...Chapter 1 Introduction IED S 1 3 1 2 Model Name 1 3 Serial Number...
Страница 24: ...Chapter 2 Installation IED S 2 5 Ambient Temperature Derating Curve Altitude Derating Curve...
Страница 25: ...Chapter 2 Installation IED S 2 6 The page intentionally left blank...
Страница 29: ...Chapter 3 Wiring IED S 3 4 IED S Integrated Elevator Drive System Wiring Diagram 01 System Configuration...
Страница 32: ...Chapter 3 Wiring IED S 3 7...
Страница 35: ...Chapter 3 Wiring IED S 3 10 3 3 Related Wiring Diagrams 03 Main Circuit for Drive Control Synchronous...
Страница 36: ...Chapter 3 Wiring IED S 3 11 04 Main Circuit for Drive Control Asynchronous...
Страница 38: ...Chapter 3 Wiring IED S 3 13 06 Safety Hatch...
Страница 39: ...Chapter 3 Wiring IED S 3 14 07 Brake Circuit...
Страница 40: ...Chapter 3 Wiring IED S 3 15 08 Inspection Circuit Cartop Inspection Connected to IED S Control Board...
Страница 42: ...Chapter 3 Wiring IED S 3 17 10 Input Contacts of Main Control Board for the Control Panel...
Страница 43: ...Chapter 3 Wiring IED S 3 18 11 Output Contacts of Main Control Board for the Control Panel...
Страница 44: ...Chapter 3 Wiring IED S 3 19 12 Contacts of Cartop Board OCB...
Страница 45: ...Chapter 3 Wiring IED S 3 20 13 Maneuvering Box 1 16 Floor ICB...
Страница 46: ...Chapter 3 Wiring IED S 3 21 14 1 Hall Call System...
Страница 50: ...Chapter 3 Wiring IED S 3 25 15 Lighting Circuit...
Страница 51: ...Chapter 3 Wiring IED S 3 26 16 UCMP Board Three Sensors DZU FL1 and DZD...
Страница 52: ...Chapter 3 Wiring IED S 3 27 17 UCMP Board Four Sensors DZU FL1 FL2 and DZD...
Страница 66: ...Chapter 5 Control Terminals IED S 5 1 Chapter 5 Control Terminals 5 1 Control Terminal Specifications...
Страница 67: ...Chapter 5 Control Terminals IED S 5 2 5 1 Control Terminal Specifications...
Страница 73: ...Chapter 5 Control Terminals IED S 5 8 The page intentionally left blank...
Страница 115: ...Chapter 6 Optional Accessories IED S 6 42 EMC Filter Model No B84143D0075R127 B84143D0090R127 Unit mm inch...
Страница 116: ...Chapter 6 Optional Accessories IED S 6 43 EMC Filter Model No B84143D0150R127 Unit mm inch...
Страница 117: ...Chapter 6 Optional Accessories IED S 6 44 EMC Filter Model No B84143D0200R127 Unit mm inch...
Страница 118: ...Chapter 6 Optional Accessories IED S 6 45 EMC Filter Model No B84142A0042R122 Unit mm inch...
Страница 123: ...Chapter 6 Optional Accessories IED S 6 50 The page intentionally left blank...
Страница 143: ...Chapter 7 Option Cards IED S 7 20 The page intentionally left blank...
Страница 151: ...Chapter 9 Digital Keypad IED S 9 4 Keypad Operation Process...
Страница 176: ...Chapter 10 Auto tuning Process IED S 10 9 10 3 2 Default Settings for Output Contacts of IED S Main Control Board...
Страница 177: ...Chapter 10 Auto tuning Process IED S 10 10 10 3 3 Default Settings for Contacts of IED S Cartop Board...
Страница 201: ...Chapter 10 Auto tuning Process IED S 10 34 The page intentionally left blank...
Страница 249: ...Chapter 11 Summary of Parameter Settings IED S 11 48 The page intentionally left blank...
Страница 263: ...Chapter 12 Descriptions of Parameter Settings IED S 12 00 14 The page intentionally left blank...
Страница 273: ...Chapter 12 Descriptions of Parameter Settings IED S 12 01 10 The page intentionally left blank...
Страница 281: ...Chapter 12 Descriptions of Parameter Settings IED S 12 02 8 The page intentionally left blank...
Страница 307: ...Chapter 12 Descriptions of Parameter Settings IED S 12 05 6 The page intentionally left blank...
Страница 319: ...Chapter 12 Descriptions of Parameter Settings IED S 12 06 12 The page intentionally left blank...
Страница 325: ...Chapter 12 Descriptions of Parameter Settings IED S 12 07 6 The page intentionally left blank...
Страница 345: ...Chapter 12 Descriptions of Parameter Settings IED S 12 10 8 The page intentionally left blank...
Страница 349: ...Chapter 12 Descriptions of Parameter Settings IED S 12 11 4 The page intentionally left blank...
Страница 359: ...Chapter 12 Descriptions of Parameter Settings IED S 12 12 10 The page intentionally left blank...
Страница 375: ...Chapter 12 Descriptions of Parameter Settings IED S 12 13 16 The page intentionally left blank...
Страница 381: ...Chapter 13 Warning Codes IED S 13 6 The page intentionally left blank...
Страница 415: ...Appendix A Single phase Application IED S A 4 The page intentionally left blank...
Страница 417: ...Appendix B Revision History IED S B 2 The page intentionally left blank...