154
Installing System Components
17
If applicable, install the memory-riser blanks. See "Installing a Memory-
Riser Blank" on page 100.
18
Close the system. See "Closing the System" on page 90.
19
Reconnect your system and peripherals to their electrical outlets, and turn
on the system.
Power Supplies
Your system supports the following power supply modules:
•
1100 W (high output power supply)
•
750 W (energy smart power supply)
When a 10 Gb I/O card is installed, the system must have at least two power
supplies connected to an A/C power supply. The system requires two power
supplies to provide standby power to the system. With a 1 GbE I/O card, only
one PSU is required to provide standby power to the system. Table 3-4 and
Table 3-5 lists the power supply redundancy modes for a 10 Gb I/O card and a
1 GbE I/O card.
Table 3-4.
Power Supply Redundancy Modes With a 10 Gb I/O Card
Number of Power Supplies
Redundancy Mode
System Configuration
1
1+0*
Non-redundant
configuration with inactive
SFP+ ports
2
2+0
Non-redundant
configuration
3
2+0
Non-redundant
configuration
4
2+2
Redundant configuration
* indicates that the system operates with a limited load.
book.book Page 154 Wednesday, January 20, 2010 10:20 AM
Содержание PowerEdge R910
Страница 1: ...Dell PowerEdge R910 Hardware Owner s Manual Regulatory Model E06S Series Regulatory Type E06S001 ...
Страница 62: ...62 About Your System ...
Страница 84: ...84 Using the System Setup Program and UEFI Boot Manager ...
Страница 130: ...130 Installing System Components Figure 3 21 Removing and Installing the Panel 1 latch 2 panel 2 1 ...
Страница 172: ...172 Installing System Components ...
Страница 192: ...192 Troubleshooting Your System ...
Страница 204: ...204 Getting Help ...
Страница 210: ...Index 210 ...