About Your System
47
module A2, port 13. Mezzanine card 3, connection 1 will
connect to I/O
module C1, port
13
and
Mezzanine card 3, connection 2 will
connect to I/O
module C2 port
13
.
Table 1-12 shows the port number assignments for the
eight possible full height blade locations.
Table 1-12.
I/O Module Port Assignments - Full-Height Blades
Blade 1
I/O Module
A1
C1
A1
C2
B2
A2
Integrated LOM1 Port 1
Port 1
Integrated LOM2 Port 9
Port 9
Mezz1_Fab_C
Port 1
Port 1
Mezz2_Fab_B
Port 1
Port 1
Mezz3_Fab_C
Port 9
Port 9
Mezz4_Fab_B
Port 9
Port 9
Blade 2
I/O Module
A1
B1
C1
C2 B2
A2
Integrated LOM1 Port 2
Port 2
Integrated LOM2 Port 10
Port 10
Mezz1_Fab_C
Port 2
Port 2
Mezz2_Fab_B
Port 2
Port 2
Mezz3_Fab_C
Port 10
Port 10
Mezz4_Fab_B
Port 10
Port 10
Blade 3
I/O Module
A1
B
1
C1
C2
B2
A2
Integrated LOM1 Port 3
Port 3
Integrated LOM2 Port 11
Port 11
Mezz1_Fab_C
Port 3
Port 3
Mezz2_Fab_B
Port 3
Port 3
Содержание PowerEdge M600
Страница 10: ...10 Contents 8 Getting Help 217 Contacting Dell 217 Glossary 219 Index 231 ...
Страница 50: ...50 About Your System Figure 1 16 Example of Full Height Blade Port Mapping Blade 3 ...
Страница 52: ...52 About Your System Figure 1 17 Example of Half Height Blade Port Mapping ...
Страница 156: ...156 Installing Blade Components ...
Страница 178: ...178 Installing Enclosure Components ...
Страница 202: ...202 Running System Diagnostics ...
Страница 216: ...216 System Board Information ...
Страница 218: ...218 Getting Help ...
Страница 236: ...236 Index ...