Check
List
Task
Topic
☐
10
Slide the system into the cabinet.
Slide the system into the cabinet
page 165.
☐
11
Connect the I/O cables and power cords. See
Connect the I/O cables and power
on page 164.
☐
12
Install the bezel.
on page 166.
Perform mandatory software tasks to return the node to operation:
☐
13
Return the node to operation.
See "Return the node to operation after
replacing the storage controller card" in
the VxFlex Ready Node Field Replacement
Unit Software Guide
.
Remove the HBA330 controller
Before you begin
Follow all safety guidelines.
Procedure
1. Locate the PCIe slot in which the controller is located.
2. Remove the screws on the bracket, if any, or use the system’s retention clips to
remove the controller from the system.
Note
To avoid damage to the controller, hold the controller by its edges only.
3. Remove the connector that attaches the controller to the system board.
Hardware FRU procedures
Remove the HBA330 controller
137
Содержание EMC VxFlex Ready Node R840
Страница 10: ...TABLES 10 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...
Страница 12: ...Notes cautions and warnings 12 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...
Страница 218: ...Getting help 218 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...