Che
ck
List
Task
Topic
☐
10 Install the replacement NIC
card.
Install the network daughter card
☐
11 Install the expansion card
riser.
Install the expansion card risers
on page 106.
☐
12 Install the system cover.
☐
13 Slide the system into the
cabinet.
Slide the system into the cabinet
on page 165.
☐
14 Connect the I/O cables and
power cords.
Connect the I/O cables and power cords
on page
164.
☐
15 Install the bezel.
Perform mandatory software tasks to return the node to operation:
☐
16 Verify the NIC in system
setup.
See "Network card replacement procedural checklist" in
the VxFlex Ready Node Field Replacement Unit Software
Guide
. Perform the relevant tasks, starting with "" until
you are directed back to this guide for Verify the NIC in
System Setup (BIOS)."
☐
17 Verify the new network card
in the server.
☐
18 Return the node to
operation.
Remove the network daughter card
Procedure
1. Using a Phillips #2 screwdriver, loosen the captive screws that secure the
network daughter card (NDC) to the system board.
2. Hold the NDC by the edges, and lift to disengage it from the connector on the
system board.
3. Slide the NDC towards the front of the system until the Ethernet connectors
are clear of the slot in the back of the system.
Hardware FRU procedures
120
VxFlex Ready Node R840
Hardware Field Replacement Unit and Service Manual
Содержание EMC VxFlex Ready Node R840
Страница 10: ...TABLES 10 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...
Страница 12: ...Notes cautions and warnings 12 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...
Страница 218: ...Getting help 218 VxFlex Ready Node R840 Hardware Field Replacement Unit and Service Manual ...