cp. 20180523033106 2018-05-23 09:01:06 IST Validated No
cp. 20180523033444
2018-05-23 09:04:44 IST Yes
cp. 20180523054859 2018-05-23 11:18:59 IST No
cp. 20180523055705 2018-05-23 11:27:05 IST No
7. Run the following command mccli checkpoint validate --
cptag=<cp_tag_of_new_checkpoint> --override_maintenance_scheduler
to validate the checkpoint.
admin@xxxxxxx:/home/admin/>: mccli
checkpoint validate --cptag=cp.20180523033444 --
override_maintenance_scheduler
0,22612,Starting to validate a server checkpoijnt
Attribute Value
tag cp. 20180523033444
type Full
8. Run the mccli checkpoint show command to check the status of the validation
process of the checkpoint. The screen will display In Progress for an extended
period of time. Wait until the screen displays a Validated status for the
checkpoint tag.
admin@xxxxxxx:/home/admin/>:
mccli checkpoint show
0,23000,CLI command completed successfully
Tag Time Validated Deletable
cp. 20180523033106 2018-05-23 09:01:06 IST Validated No
cp. 20180523033444 2018-05-23 09:04:44 IST
In Progress
Yes
cp. 20180523054859 2018-05-23 11:18:59 IST No
cp. 20180523055705 2018-05-23 11:27:05 IST No
admin@xxxxxxx:/home/admin/>:
mccli checkpoint show
0,23000,CLI command completed successfully
Tag Time Validated Deletable
cp. 20180523033106 2018-05-23 09:01:06 IST Validated No
cp. 20180523033444 2018-05-23 09:04:44 IST
Validated
Yes
cp. 20180523054859 2018-05-23 11:18:59 IST No
cp. 20180523055705 2018-05-23 11:27:05 IST No
9. From the root login , run the avmaint hfscheckstatus <checkpoint_tag> --
avacommand to check the status of the job. If necessary, run the avmaint
hfscheck --checkpoint=<checkpoint tag> --ava to perform an hfscheck on
the checkpoint. Wait until above hfscheck job status command gives a
completed status.
root@xxxxxxx:/home/admin/#:avmaint hfscheckstatus cp.
20180524033103 --ava
<?xml version="1.0" encoding-"UTF-8" standalone-"yes"?>
<hfscheckstatus
nodes-queried="1"
nodes-replied="1"
nodes-total="1"
checkpoint="cp.20180524033103"
status="waitcomplete"
type="full"
checks="full"
elapsed-time="114"
start-time="1527154524"
end-time="0"
check-start-time="1527154524"
check-end-time="1527154562"
generation-time="1527154565"
stripes-checking="31"
stripes-completed="31"
offline-stripes="0"
Prepare the Integrated Data Protection Appliance for Hardware Replacement
DELL EMC CONFIDENTIAL
Shut down the IDPA
15