PIM00413
5-1
Chapter 5 Start-up Procedure
Start-up Procedure are as follows.
1.
Check
・・・・・・・・・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 6 Confirmation of the Arrival Product”
2.
Transportation and installation
・・・・・・・・・・
Refer to “Chapter 7 Transportation and Installation”
3.
Piping
・・・・・・・・・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 8 Piping”
4.
Electric wiring
・・・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 9 Electric Wiring”
5.
Turning on the power
・・・・・・・・・・・・・・・・・
Refer to “Chapter 10 Test Run”
Please make sure the following items firstly and turning on the
power.
Is it already correctly installed?
Is it already correctly plumbed?
Is the hydraulic oil injected?
Is it already correctly wired?
Is the power supply voltage correct?
6.
Flushing running
・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 10 Test Run”
7.
Oil replacement
・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 10 Test Run”
8.
Air vent
・・・・・・・・・・・・・・・・・・・・・・・・・・
Refer to “Chapter 10 Test Run”
9.
Operation check
・・・・・・・・・・・・・・・・・・・
Please check the operation of the actuator. Please refer to “11.5
Setup mode”, change the setting value of the pressure and flow rate
Содержание SUT06S3016-30
Страница 2: ......
Страница 12: ......
Страница 20: ...PIM00413 3 6 3 4 Dimensions Motor Pump Type SUT00 SUT00S3016 30...
Страница 21: ...PIM00413 3 7 SUT00S6007 30...
Страница 22: ...PIM00413 3 8 SUT00D4016 30 SUT00D6021 30 Product type Dimension...
Страница 23: ...PIM00413 3 9 Unit Type SUT06 SUT10 SUT06S3016 30...
Страница 24: ...PIM00413 3 10 SUT06S6007 30...
Страница 25: ...PIM00413 3 11 SUT06D4016 30 SUT06D6021 30 1 327 for SUT06D6021 30 2 188 for SUT06D6021 30 2...
Страница 26: ...PIM00413 3 12 SUT10D6021 30...
Страница 36: ......
Страница 38: ......
Страница 42: ......
Страница 54: ......
Страница 64: ......