PIM00413
10-1
Chapter 10
Test Run
CAUTION
●
To be ready just in case, make sure the power is able to be quickly shut off.
●
If unexpected action occurs, please make sure that it is safe, then operate it.
Refer to "Chapter5 Start-up Procedure", and make sure that all preparation has been completed.
①
Power on
Turn ON the switch on the machine control panel
、
supply the power to the unit. After
power-on, it will be started in about 3 seconds.Make sure the following points.
A
.
The display of controller operation panel is flashing
B
.
Confirm that the oil cooler AC fan motor is running.
C
.
Check the pump operation sound, and confirm that a pressure indicated on the
display panel increases.
②
Flushing
After completion of the start check, loop all pipes (except for the actuator), and execute
flushing operation for approx. two hours while running hydraulic oil through the filter.
③
Oil replacement
Drain all hydraulic oil from the tank through the oil drain port of the tank. Fill new
hydraulic oil through the oil filling port (air breather) to the specified level. Check the
return filter indicator. If the filter is clogged, replace the filter element.
④
Air vent
Evacuate air from the hydraulic circuit completely
If air is not completely evacuated, the following phenomena may occur.
An abnormal
activation of actuator such as cylinder, an abnormal sound from the pumps and valves.
Содержание SUT06S3016-30
Страница 2: ......
Страница 12: ......
Страница 20: ...PIM00413 3 6 3 4 Dimensions Motor Pump Type SUT00 SUT00S3016 30...
Страница 21: ...PIM00413 3 7 SUT00S6007 30...
Страница 22: ...PIM00413 3 8 SUT00D4016 30 SUT00D6021 30 Product type Dimension...
Страница 23: ...PIM00413 3 9 Unit Type SUT06 SUT10 SUT06S3016 30...
Страница 24: ...PIM00413 3 10 SUT06S6007 30...
Страница 25: ...PIM00413 3 11 SUT06D4016 30 SUT06D6021 30 1 327 for SUT06D6021 30 2 188 for SUT06D6021 30 2...
Страница 26: ...PIM00413 3 12 SUT10D6021 30...
Страница 36: ......
Страница 38: ......
Страница 42: ......
Страница 54: ......
Страница 64: ......