Si21-205
FFQ25/35/50/60BV1B
Removal Procedure
241
1.9
Removal of Drain Pump
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the drain pump
1
Remove two screws
fixing float switch ass'y.
(Screw
and
)
2
Remove the float switch
ass'y.
Remove the float switch
before removing drain pump
in order to prevent the float
switch from damage.
3
Cut the tie wrap fixing
the drain hose.
Remove the screw
When pulling out the drain
hose, be sure to wear safety
gloves to prevent your finger
from injury with heat
exchanger fin.
4
Pull out the drain hose.
5
Remove the drain
pump.
Screw
Q
Screw
R
Screw
S
(S2660)
(S2661)
Screw
Q
(S2662)
(S2664)
(S2663)
Содержание Sky Air B-Series R-410A
Страница 7: ...Si21 205 vi Table of Contents ...
Страница 15: ...Models Si21 205 4 Model Name and Power Supply ...
Страница 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Страница 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Страница 77: ...Settings Concerning Maintenance Si21 205 66 Field Setting FHQ B Service monitor LED Capacity setting adaptor ...
Страница 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Страница 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Страница 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Страница 246: ...Si21 205 FFQ25 35 50 60BV1B Removal Procedure 235 4 Remove the horizontal vane Step Procedure Points S2646 ...
Страница 283: ...Outdoor Unit 25 35 class Si21 205 272 Removal Procedure 2 Slide the MID upward and release Step Procedure Points ...
Страница 285: ...Outdoor Unit 25 35 class Si21 205 274 Removal Procedure 4 Remove the fan motor Step Procedure Points ...
Страница 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...