
Si21-205
FFQ25/35/50/60BV1B
Removal Procedure
231
1.2
Removal of Air Filter
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Removing the air filter
1
Open the suction grille.
(See the "Removal of
Suction Grille".)
2
Disengage the hooks of
the air filter by pulling
the filter downward at
an angle, and remove
the filter.
2. Installation of the air filter
1
Hook the air filter to the
protrusions located at
the top of the suction
grille.
2
Push the lower section
of the air filter into the
protrusions located at
the bottom of the
suction grille to secure
the air filter in place.
(S2632)
(S2633)
(S2634)
(S2635)
Содержание Sky Air B-Series R-410A
Страница 7: ...Si21 205 vi Table of Contents ...
Страница 15: ...Models Si21 205 4 Model Name and Power Supply ...
Страница 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Страница 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Страница 77: ...Settings Concerning Maintenance Si21 205 66 Field Setting FHQ B Service monitor LED Capacity setting adaptor ...
Страница 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Страница 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Страница 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Страница 246: ...Si21 205 FFQ25 35 50 60BV1B Removal Procedure 235 4 Remove the horizontal vane Step Procedure Points S2646 ...
Страница 283: ...Outdoor Unit 25 35 class Si21 205 272 Removal Procedure 2 Slide the MID upward and release Step Procedure Points ...
Страница 285: ...Outdoor Unit 25 35 class Si21 205 274 Removal Procedure 4 Remove the fan motor Step Procedure Points ...
Страница 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...