
Si21-205
FFQ25/35/50/60BV1B
Removal Procedure
245
5
Take out the two tie
wraps fixing the anti
sweat tube of header
and thermistor.
(Be sure not to take out
other tie wrap.)
Heat resistance tie wrap is
used. Be sure to use a heat
resistance tie wrap when
installing new thermistor.
∗
Heat resistance tie wrap
Parts No. :1278921
(Drg No. :4SA90202-1)
6
Pull out the thermistor
from the insertion pipe.
Thermistor for heating :
The upper one wrapped
with a yellow tape
Thermistor for liquid
pipe :
The lower one without
taping
Replace thermistor as an
ass'y. (Two thermistors are
bound with special heat
resistance tube.)
Step
Procedure
Points
(S2673)
Anti sweat tube
(S2674)
Содержание Sky Air B-Series R-410A
Страница 7: ...Si21 205 vi Table of Contents ...
Страница 15: ...Models Si21 205 4 Model Name and Power Supply ...
Страница 16: ...Si21 205 Functions 5 Part 2 Functions 1 List of Functions 6 ...
Страница 35: ...Wireless Remote Controller Si21 205 24 Remote Controller ...
Страница 77: ...Settings Concerning Maintenance Si21 205 66 Field Setting FHQ B Service monitor LED Capacity setting adaptor ...
Страница 79: ...Settings Concerning Maintenance Si21 205 68 Field Setting Detail of PCB 2 ...
Страница 83: ...Maintenance Mode Setting Si21 205 72 Field Setting ...
Страница 239: ...Troubleshooting for Outdoor Unit 50 60 class Si21 205 228 Troubleshooting ...
Страница 246: ...Si21 205 FFQ25 35 50 60BV1B Removal Procedure 235 4 Remove the horizontal vane Step Procedure Points S2646 ...
Страница 283: ...Outdoor Unit 25 35 class Si21 205 272 Removal Procedure 2 Slide the MID upward and release Step Procedure Points ...
Страница 285: ...Outdoor Unit 25 35 class Si21 205 274 Removal Procedure 4 Remove the fan motor Step Procedure Points ...
Страница 321: ...Outdoor Unit 50 60 class Si21 205 310 Removal Procedure ...