
Si39-406
Drawings & Flow Charts
v
Refrigerant Piping ................................................... 146
S
Selecting Installation Site ........................................ 178
Selection of Location............................................... 141
AM broadcasting......................................... 57
servicing and the minimum space .............. 56
Service Space ........................................................... 58
Service Space for Indoor Units ................................. 17
Set the flaring tool ..................................................... 26
Setting of Air Flow Direction Adjustment Range ....... 73
Setting of Demand Operation.................................... 89
Setting of Low Noise Operation ................................ 87
Setting the Master Remote Controller..................... 207
Side (bottom) connection ........................................ 147
Signal interference due to use of
multiple core cable ........................................... 123
Operational steps ............................................... 14
Steel insert.......................................................... 15
Through holes in a reinforced concrete beam .... 14
Sound pressure rise due to room reverberation........ 99
Special vacuum drying time chart ............................. 40
Standard Operation Limit ........................................ 136
standard work practice for all brazing work............... 21
System example...................................................... 161
T
The analysis of major installation problems
experienced during the year of 1988 ................... 7
The centralized control group number
cannot be set ................................................... 129
The unit must be installed on a solid longitudinal
foundation ........................................................ 144
The use of “hard solder” is essential ......................... 25
Thermal Insulation Work (Refrigerant Piping)
Essential Points of Thermal Insulation................ 31
Heat Recovery Series......................................... 32
Operational steps ............................................... 31
Tighten the bolts in opposite corners first to ensure that
the connection is true ......................................... 30
Torque wrench ........................................................ 220
Transmission wiring between the cool/heat
U
Unpacking and Placing the Unit ................................ 60
DO NOT USE STANDS TO SUPPORT THE
CORNERS............................................. 60
foundation bolts .................................................. 60
passing piping out through the front ....................61
The unit must be installed on a solid longitudinal
foundation ..............................................60
V
Vacuum Drying ..........................................................34
Vacuum Drying Procedure.........................................38
Vacuum pump with check valve ..............................220
VRV Inspection Sheet..............................................114
W
Weigher for refrigerant charge.................................223
Where there are no smaller room divisions ...............97
Wired Remote Controller ...........................................68
Wiring Diagram
Field Wiring .......................................................122
Wiring Diagrams ......................................................121
Field Wiring .......................................................122
Outdoor Unit ......................................................121
with cool/heat changeover .......................................202
without cool/heat changeover ..................................201
Содержание REYQ96MTJU
Страница 1: ...Design Installation Testing Instruction R410A Heat Recovery 60Hz REYQ96MTJU Si39 406...
Страница 6: ...Si39 406 iv Table of Contents...
Страница 34: ...Installation Si39 406 28 General Information Flaring Procedure...
Страница 68: ...Installation Si39 406 62 General Information Caution Caution label 3P124617 4P124614...
Страница 114: ...Appendix Si39 406 108 General Information 3P135887 1...
Страница 124: ...Appendix Si39 406 118 General Information 7 8 Piping System Diagrams 7 8 1 Outdoor Unit REYQ96MTJU 4D045329...
Страница 126: ...Appendix Si39 406 120 General Information 7 8 3 BS Unit BSVQ36MVJ BSVQ60MVJ 4D045338...
Страница 127: ...Si39 406 Appendix General Information 121 7 9 Wiring Diagrams 7 9 1 Outdoor Unit REYQ96MTJU 3D044892A...
Страница 128: ...Appendix Si39 406 122 General Information 7 9 2 Field Wiring REYQ96MTJU 3D042647A...
Страница 156: ...Refrigerant Piping Si39 406 150 Installation Manual REYQ96MTJU...
Страница 158: ...Refrigerant Piping Si39 406 152 Installation Manual REYQ96MTJU...
Страница 230: ...Precautions for New Refrigerant R410A Si39 406 224 Precautions for New Refrigerant R410...
Страница 236: ...375 Park Avenue Suite 3308 New York N Y 10152 info daikinac com www daikinac com...