
Test Operation
Si39-406
94
General Information
[Operation procedure detail]
c
After turning the respective remote switch of indoor and outdoor units off and charging the
refrigerant, turn on the power of indoor and outdoor units.
Do not fail to turn the power off and charge the refrigerant with outdoor unit in stop mode before
adding the refrigerant following this procedure, otherwise resulting in trouble.
d
Fully open the stop valve on the gas side and oil equalizing valve for multi outdoor connection,
and do not fail to fully close the stop valve on the liquid side. (If the stop valve on the liquid side
is open, the refrigerant cannot be charged.)
e
In
Setting mode 2
(H1P : ON) with outdoor unit in stop mode, Set “A Additional refrigerant
charging operation” switch to ON to start the operation. (H2P turns to display TEST
OPERATION (blinks), and “TEST OPERATION” and “IN CENTRALIZED CONTROL” are
displayed on the remote controller.)
f
When the refrigerant is charged up to the specified amount, press the RETURN button (BS3) to
stop charging.
The charging operation is automatically stopped after operating for a maximum of about 30
minutes.
If the charging is not complete within 30 minutes, set the A Additional refrigerant charging
operation again to start charging. When the charging immediately stops even by restarting, the
refrigerant is charged excessively. The refrigerant cannot be charged any more.
g
Do not fail to fully open the stop valve on the liquid side
as soon as disconnecting the
refrigerant charging hose.
(The piping may be burst due to the liquid sealing.)
[Operation state]
•
Compressor frequency : 210Hz
•
Y4S, Y7S, Solenoid valve : Open Y1E, Y2E electronic expansion valve : 1400 pulse
•
Outdoor unit fan : High pressure control
•
Indoor unit expansion valve (All unit) : 1024 pulse
•
Indoor unit fan : H tap
4.4.2.5 Setting of Refrigerant Recovery Mode
When carrying out the refrigerant collection on site, fully open the respective expansion valve of
indoor and outdoor units
[Operation procedure]
c
In
setting mode 2
with units in stop mode, set “B Refrigerant Recovery / Vacuuming mode” to
ON. The respective expansion valve of indoor and outdoor units are fully opened. (H2P turns to
display “TEST OPERATION” (blinks), “TEST OPERATION” and “IN CENTRALIZED
CONTROL” are displayed on the remote controller, and the operation is prohibited.
d
Collect the refrigerant using a refrigerant recovery unit. (See the instruction attached to the
refrigerant recovery unit for more detal.)
e
Press Mode button “BS1” once and reset “Setting Mode 2”.
Содержание REYQ96MTJU
Страница 1: ...Design Installation Testing Instruction R410A Heat Recovery 60Hz REYQ96MTJU Si39 406...
Страница 6: ...Si39 406 iv Table of Contents...
Страница 34: ...Installation Si39 406 28 General Information Flaring Procedure...
Страница 68: ...Installation Si39 406 62 General Information Caution Caution label 3P124617 4P124614...
Страница 114: ...Appendix Si39 406 108 General Information 3P135887 1...
Страница 124: ...Appendix Si39 406 118 General Information 7 8 Piping System Diagrams 7 8 1 Outdoor Unit REYQ96MTJU 4D045329...
Страница 126: ...Appendix Si39 406 120 General Information 7 8 3 BS Unit BSVQ36MVJ BSVQ60MVJ 4D045338...
Страница 127: ...Si39 406 Appendix General Information 121 7 9 Wiring Diagrams 7 9 1 Outdoor Unit REYQ96MTJU 3D044892A...
Страница 128: ...Appendix Si39 406 122 General Information 7 9 2 Field Wiring REYQ96MTJU 3D042647A...
Страница 156: ...Refrigerant Piping Si39 406 150 Installation Manual REYQ96MTJU...
Страница 158: ...Refrigerant Piping Si39 406 152 Installation Manual REYQ96MTJU...
Страница 230: ...Precautions for New Refrigerant R410A Si39 406 224 Precautions for New Refrigerant R410...
Страница 236: ...375 Park Avenue Suite 3308 New York N Y 10152 info daikinac com www daikinac com...