Installation
Si39-406
26
General Information
Brazing
a) Brazing work should be carried out such that the final result is directed either downwards or
sideways. An upward direction should be avoided wherever possible. (to prevent leakage)
b) Liquid and gas pipe branches should always be dealt with in the specified way with attention
being paid to the direction of the fitting and its angle. (to prevent oil return or drift) For example
see page 127.
c) It is standard working practice to use the nitrogen replacement method when brazing.
Important points
1. Every effort must be made to avoid fire. (Clean area where brazing is to be performed and make
sure that fire fighting equipment and water are ready to hand.)
2. Be careful of burns.
3. Make sure that the gap between the pipe and the joint is correct. (To prevent leaks)
4. Is the pipe adequately supported?
As a rule the gaps between supports for horizontal piping (copper pipe) are as follows:
The copper pipe should not be secured directly by metal brackets.
Flare Connection
(a) Stiffened pipe must always be annealed at least once prior to the flaring work.
(b) A pipe cutter must be used to cut the pipe. (A large pipe cutter must be used where the pipe has
a large diameter. When cutting a pipe which is too big for the pipe cutter a metal saw may be
used but care must be taken to ensure that the debris from sawing does not get into the pipe.)
(c) Set the flaring tool to make sure the flare size remains within the prescribed limits.
Copper pipe support spacing
(From HASS 107-1977)
Nominal diameter
φ
1/2 or less
φ
7/8
Maximum gap (Inch)
40
60
Nominal diameter
External diameter of pipe d
(mm)
Pipe widening dimensions A
(mm)
1/4
6.35
9.1
3/8
9.52
13.2
1/2
12.7
16.6
5/8
15.88
19.7
Содержание REYQ96MTJU
Страница 1: ...Design Installation Testing Instruction R410A Heat Recovery 60Hz REYQ96MTJU Si39 406...
Страница 6: ...Si39 406 iv Table of Contents...
Страница 34: ...Installation Si39 406 28 General Information Flaring Procedure...
Страница 68: ...Installation Si39 406 62 General Information Caution Caution label 3P124617 4P124614...
Страница 114: ...Appendix Si39 406 108 General Information 3P135887 1...
Страница 124: ...Appendix Si39 406 118 General Information 7 8 Piping System Diagrams 7 8 1 Outdoor Unit REYQ96MTJU 4D045329...
Страница 126: ...Appendix Si39 406 120 General Information 7 8 3 BS Unit BSVQ36MVJ BSVQ60MVJ 4D045338...
Страница 127: ...Si39 406 Appendix General Information 121 7 9 Wiring Diagrams 7 9 1 Outdoor Unit REYQ96MTJU 3D044892A...
Страница 128: ...Appendix Si39 406 122 General Information 7 9 2 Field Wiring REYQ96MTJU 3D042647A...
Страница 156: ...Refrigerant Piping Si39 406 150 Installation Manual REYQ96MTJU...
Страница 158: ...Refrigerant Piping Si39 406 152 Installation Manual REYQ96MTJU...
Страница 230: ...Precautions for New Refrigerant R410A Si39 406 224 Precautions for New Refrigerant R410...
Страница 236: ...375 Park Avenue Suite 3308 New York N Y 10152 info daikinac com www daikinac com...