User’s Manual EM11A017
DCM601A71 intelligent Touch Manager
241
•
Checking the Budget to Actual Energy Consumption
Assess the level of achievement by comparing the value set in the energy consumption plan and
the actual energy consumption, and display it graphically.
Furthermore, display the estimated consumption when the plan is fully achieved and the
objective for achieving the plan by calculating from the current actual value.
The Energy budget/actual management screen consists of three tabs: Yearly budget/actual
mgmt., Month budget/actual mgmt., and Compared to previous (F)Year. Check with each tab the
budget to actual energy consumption.
Touch the E budget/actual Mgmt. button on the Energy Navigator tab of the Menu List screen.
(See page 57.)
Yearly budget/actual mgmt.Tab (Energy budget/actual management Screen)
(41)
(47)
(44)
(46)
(42)
(43)
(45)
This screen displays the yearly budget to actual energy consumption status for the Energy Group
selected in the
Display item
combo box
(41)
.
Set the energy type to plot in the
Energy Type
combo box
(42)
.
Select from Power, Gas and Water.
Only when the unit of energy is CO
2
or new conversion type, you will be able to select the “total”
of CO
2
emitted by all types of energy.
Selecting the unit of energy to display in the graph from Energy, CO
2
, and new conversion type in
the
Energy Unit
combo box
(43)
plots the graph in
(44)
.
In the graph, the horizontal axis represents each month of the year from the collection start
month, the left vertical axis the monthly energy consumption, and the right vertical axis the
accumulated energy consumption.
To switch the displayed year, use
(45)
.
Touching the
Legend
button
(46)
displays an explanation of each graph component.
Содержание Intelligent Touch Manager DCM601A71
Страница 309: ...EM11A017 1208 HT...