System control
Si18-201
164
Main Functions
3.35
Inter-BP Units Gas Pipe Isothermal Control
Purpose of the
Function
This function ensures appropriate refrigerant distribution to each BP unit when many room units
are operating in the cooling mode.
Outline
The gas pipe temperatures of operating room units are detected by the gas pipe thermistors,
and the opening degrees of the motorized valves are corrected so as to equalize the gas pipe
temperatures of the room units.
When gas pipe temperature is higher than average gas pipe temperature
→
Opens the valve
of that room unit
When liquid pipe temperature is lower than average gas pipe temperature
→
Closes the
valve of that room unit
In this control, the following conditions are also effective.
When the difference between the gas pipe temperature of each room unit and the average
value is small, no correction is provided.
→
Judged as stable. (Set as PI control prohibit zone to prevent hunting)
The motorized valve opening degree correction of this function is restricted to prevent the
valve closing past a certain level.
→
For improvement of stability and convergibility performance
Details
The temperature difference
∆
DCG1 between the min. value of the heat exchanger temperatures
of BP units and the min. gas pipe temperature is calculated. If it is lower than the average value
of total temperature difference (-5°C), open the motorized valve of the applicable BP unit.
Содержание FTX25JVEA9
Страница 9: ...Si18 201 viii Table of Contents...
Страница 71: ...Specifications Si18 201 58 Specifications...
Страница 206: ...Si18 201 Remote Controller Operations 193 1 1 2 FVX25 35KZ...
Страница 207: ...Remote Controller Si18 201 194 Operations 1 1 3 FTXD25 35KZ...
Страница 208: ...Si18 201 Remote Controller Operations 195 1 1 4 FTK FTX50 60H...
Страница 209: ...Remote Controller Si18 201 196 Operations 1 1 5 FTKD FTXD50 60 71J...
Страница 213: ...Remote Controller Si18 201 200 Operations 1 1 9 FHYC35 50 60 71K Optional Accessory BRC7C612WC...
Страница 214: ...Si18 201 Remote Controller Operations 201...
Страница 216: ...Si18 201 Remote Controller Operations 203...
Страница 217: ...Remote Controller Si18 201 204 Operations...
Страница 234: ...Si18 201 Method of Field Set Operating Test 221 2 3 Interface Adaptor for Room Airconditioner KRP928A1S...
Страница 237: ...Method of Field Set Si18 201 224 Operating Test...
Страница 262: ...Si18 201 Troubleshooting SkyAir Indoor Unit Service Diagnosis 249...
Страница 393: ...Wiring Diagrams Si18 201 380 Appendix FHYC35 50 60 71KVE9 3D005668C...
Страница 394: ...Si18 201 Wiring Diagrams Appendix 381 FHYC35 50 60 71KV1C9...
Страница 395: ...Wiring Diagrams Si18 201 382 Appendix FDYM60 03FAV1 FDYM60 03FAVAL C 3D019816D OPTION...
Страница 396: ...Si18 201 Wiring Diagrams Appendix 383 FDYM60 03FAV1C...