Si18-201
System control
Main Functions
109
3.
System control
3.1
Outline of System Control
YES
YES
YES
NO
NO
NO
BP unit
BP unit
EVG
EVL
EVG
EVL
BP unit
BP unit
EVG
EVG
(M1003)
Power supply ON
Compressor / OFF
Compressor / ON
Unit stop (standby control)
· Warming-up function
· Cooling electrical switch box
Heating
· Oil return control
Cooling
· Oil return control
Operation start
· Initial frequency (differ from cooling and heating)
· Decision of initial motorized valve opening.
(differ from cooling and heating)
(Before equalizing)
· Standby operation
3-minutes standby
· Equalizing control
· Fan OFF delay
ON command
OFF command
ON
command
OFF control
ON control
OFF
command
Has
the previous
standby operation
completed?
Start-up standby operation
Command
ON ?
Defrost control
Feedback control
Cooling
Heating
Cooling SC control (Decision for EVL open/close)
BP unit capacity control (Decision for EVG open/close)
(1 or 2 step control)
EVL: Open
(Super-multi control)
EVL: Close
(Independent VRV control)
EVG: Close
(Super-multi control)
EVG: Open
(Independent VRV control)
SH control
SC control
—
—
—
SC control
Target discharge pipe temp. control
Target discharge pipe temp. control
Target discharge pipe temp. control
Target discharge pipe temp. control
Reverse target discharge pipe control
Target discharge pipe control
Gas pipe isothermal control
<Excess refrigerant processing>:
Subcooling control in cooling
· Refrigerant is stored in the piping
before EV of BP unit.
<Excess refrigerant treatment>:
Reverse target discharge pipe temp. control in heating
· Firstly refrigerant is stored inside the piping
in the no-operation room unit.
· When overflow command is generated,
refrigerant is stored in the receiver.
System protection control
· Gas shortage control
· Wet protection control
· Peak cut / Freeze protection control
· Discharge pipe temp. control
· Differential pressure securing fin control
· Year-round cooling
· Input current control
· Compressor protection control
· High pressure control
Completed
Is
heating oil
return control
required?
Cooling capacity control
Heating capacity control
Содержание FTX25JVEA9
Страница 9: ...Si18 201 viii Table of Contents...
Страница 71: ...Specifications Si18 201 58 Specifications...
Страница 206: ...Si18 201 Remote Controller Operations 193 1 1 2 FVX25 35KZ...
Страница 207: ...Remote Controller Si18 201 194 Operations 1 1 3 FTXD25 35KZ...
Страница 208: ...Si18 201 Remote Controller Operations 195 1 1 4 FTK FTX50 60H...
Страница 209: ...Remote Controller Si18 201 196 Operations 1 1 5 FTKD FTXD50 60 71J...
Страница 213: ...Remote Controller Si18 201 200 Operations 1 1 9 FHYC35 50 60 71K Optional Accessory BRC7C612WC...
Страница 214: ...Si18 201 Remote Controller Operations 201...
Страница 216: ...Si18 201 Remote Controller Operations 203...
Страница 217: ...Remote Controller Si18 201 204 Operations...
Страница 234: ...Si18 201 Method of Field Set Operating Test 221 2 3 Interface Adaptor for Room Airconditioner KRP928A1S...
Страница 237: ...Method of Field Set Si18 201 224 Operating Test...
Страница 262: ...Si18 201 Troubleshooting SkyAir Indoor Unit Service Diagnosis 249...
Страница 393: ...Wiring Diagrams Si18 201 380 Appendix FHYC35 50 60 71KVE9 3D005668C...
Страница 394: ...Si18 201 Wiring Diagrams Appendix 381 FHYC35 50 60 71KV1C9...
Страница 395: ...Wiring Diagrams Si18 201 382 Appendix FDYM60 03FAV1 FDYM60 03FAVAL C 3D019816D OPTION...
Страница 396: ...Si18 201 Wiring Diagrams Appendix 383 FDYM60 03FAV1C...