6-11
Chapter 6
W
elding Condition
M
EMORY
F
UNCTION
OF
W
ELDING
C
ONDITIONS
W
ELDING
C
ONDITION
C
HAPTER
6
6.5.1 Memory registration of welding conditions
This section explains how to register the current welding condition set on the operation panel to the
memory.
1.
Press the SAVE key.
2.
Turn the parameter adjustment knob, and select the JOB No.
3.
Press the ENTER key.
4.
Press the ENTER key.
⇒
The welding condition is registered with the selected JOB No., and the storage function mode is
terminated.
The registered welding condition can be read out for use.
⇒
The system transits to the storage function mode and
the LED of the SAVE key lights up.
⇒
The JOB No. (registration No.) is displayed on the
right digital meter in a flashing mode, and the LED
of JOB No. lights up.
⇒
On the left digital meter, the setting value of the
welding current registered to the JOB No. if any is
displayed (if there is no registration, "- - -" is
displayed), and the "A" LED lights up.
⇒
When there is no registration data on the selected
JOB No., "- - -" is displayed on the left digital meter.
⇒
When there is any registration data on the selected
JOB No., the setting value of the welding current is
displayed on the left digital meter. At this time, the
LEDs for the keys of crater or wire material also light
up.
⇒
The LED of ENTER key flashes.
⇒
Pressing the DISPLAY CHANGE key enables to
check the value of welding parameter registered in
the JOB No. to overwrite. The setting values are
displayed on the left/right digital meters in a
flashing mode.
⇒
To change the JOB No. to register, press the SAVE
key. The display returns to the status described in
step 1.
⇒
To cancel the memory registration, press the LOAD
key. The storage function mode is terminated.
A
V
s
㸣
m/min.
sec.
JOB No.
SAVE
Hz
A
V
s
㸣
m/min.
sec.
JOB No.
Hz
ENTER
㧔
3 sec.
㧕
ENTER
㧔
3 sec.
㧕
Содержание OTC Welbee WB-P320E
Страница 2: ......
Страница 8: ...TABLE OF CONTENTS vi MEMO ...
Страница 28: ...PART NAMES PRODUCT SPECIFICATION AND CONFIGURATION CHAPTER 2 2 12 ...
Страница 52: ...WIRING OF VOLTAGE DETECTION CABLE AT BASE METAL SIDE CONNECTION CHAPTER 4 4 18 ...
Страница 140: ...TROUBLESHOOTING TROUBLESHOOTING CHAPTER 9 9 6 ...