144
Packing and Shipping Instructions
Cybernetics
UM-MV-86-B1-0801
5. Place the second cardboard shell on top of the chassis.
6. Open the accessory box, place the accessories inside (e.g., cables, terminators, and AC power
cord), if requested by Cybernetics, and close the box.
7. Place the two filler boxes on top of the cardboard shell.
Содержание miSAN-V6
Страница 104: ...104 Operating the Web Control Panel Cybernetics UM MV 86 B1 0801 ...
Страница 110: ...110 Telnet Menu System Cybernetics UM MV 86 B1 0801 ...
Страница 146: ...146 Packing and Shipping Instructions Cybernetics UM MV 86 B1 0801 ...
Страница 174: ...174 Cybernetics UM MV 86 B1 0801 ...
Страница 182: ...182 Cybernetics UM MV 86 B1 0801 ...
Страница 184: ...184 Cybernetics UM MV 86 B1 0801 ...