
141
Packing and Shipping Instructions
Cybernetics
UM-MV-86-B1-0801
Chapter 6
Packing and Shipping Instructions
This chapter provides instructions for transporting the miSAN-V-Series or returning the
miSAN-V-Series to Cybernetics for service or repair. The packing and shipping process
involves first removing the miSAN-V-Series from the place where it is installed, enclosing
the unit in an anti-static bag, and then placing the miSAN-V-Series in the packing materi-
als.
Removing the miSAN-V-Series
from its
Installation Environment
1. Make any attached SCSI devices (disk arrays, tape drives or libraries) ready for
removal from the SCSI bus, in accordance with the user manual for those devices.
2. Power down the miSAN-V-Series. Disconnect all cables (network, upstream and
downstream SCSI, power). Remove SCSI terminator(s) if installed.
3. If the miSAN-V-Series is rack-mounted, remove it from the rack, and remove the
slides from the sides of the unit. This will require a No. 2 Phillips screwdriver.
4. If the unit is a miSAN-V-Series-AIT, remove the dust cover from the removable tape drive
Caution
Failure to properly prepare the miSAN-V-Series for shipping can result
in shipping damage. Any damage to the miSAN incurred during
transport as a result of improper packaging will void the warranty.
Cybernetics’ warranty does not cover shipping damage.
Содержание miSAN-V6
Страница 104: ...104 Operating the Web Control Panel Cybernetics UM MV 86 B1 0801 ...
Страница 110: ...110 Telnet Menu System Cybernetics UM MV 86 B1 0801 ...
Страница 146: ...146 Packing and Shipping Instructions Cybernetics UM MV 86 B1 0801 ...
Страница 174: ...174 Cybernetics UM MV 86 B1 0801 ...
Страница 182: ...182 Cybernetics UM MV 86 B1 0801 ...
Страница 184: ...184 Cybernetics UM MV 86 B1 0801 ...