CEAG Notlichtsysteme GmbH
40
Installation
Assembly and Operating Instructions
Automatic Test System AT-S
+
with STAR
+
Technology
6.6.4 Completing Assembly
Refer to the plans and drawings for installation on site and check all of the circuits that have been made.
Check that all connections are tight.
Clear away all unused cables, insulation and fixing materials and all tools and packaging.
The revision marking on the final circuits should be done.
Содержание Ceag AT-S+ C0
Страница 76: ...400 71 860 177 XXX 07 12 WK...