10.3 Enabling of end circuits with maintenance work
Block the system via the control unit (figure). (menu item 8.4.2)
Before commencing maintenance work in the end circuit this must be separated on all poles. Therefor remove
the end circuit fuses on the module.
After maintenance work is finished, reverse the steps and cancel blocking at the control unit.
<ok>
Menu 2.1:
Block device
Release device
Manual reset
This device
all devices
Device address 01
Device name
Block device
Release device
Manual reset
<ok> initiates the function:
The selected stations will be swichted free
and restart operation.
Selection with the buttons
bet-
ween the displayed options.
Selection of a AT-S
+
system with
Device address referes to search
results in the substation setup
menu 3 «Basic settings»
<ok>
Menu 2.2:
This device
all devices
Device address 01
Device name
<ok> initiates the function:
All functions are cancelled;
all outputs will be isolated!
In case of mains failure occures no emer-
gency operation.
These must be additionally separated on
all poles before maintenance work in end
circuits. (see 10.3 Enabling of end circuits
with maintenance work)