TDMA CONTROL 602-702 Eng Nov.doc
44
5.14
CONTROL 602: Example Variant B
Function
Se
lec
tio
n
Sub
secti
on
Cannot be
combined with
F
Sensor allocation A
Output
allocation
Solar pump with
and without top
loading
X BF
-
1
2
3
Collector sensor
Store bottom (F)
Store top (A; B)
1 Collector pump 230V
*
3
East-West
V SF 1
Active frost
protection,
cooling
9
Collector sensor
2
4
Collector pump
2
230V
Yield Measurement
SF 1
East-West, T-Pro,
Solid Fuel Boiler
9
10
Yield sensor
(cold)
Yield sensor (hot)
- -
Radiation measure
AF
-
ES Radiation sensor
- -
Frost Protection
SF 2
Cooling via
Heating Circuit,
Two Store,
Boiler Control
8
Frost Protection
Sensor (Coldest
Point)
1 Collector pump 230V
Cooling
SF 3
DHW Back-up
Htg, Circulation,
Pump Control
3 Store Top (A; B) 2 Cooling
230V
Two Store
*
1
(Priority, Equal
Priority), Swimming
Pool
SF 2
Frost Protection,
Cooling via
Heating Circuit,
Boiler Control
8
Store 2 Bottom;
Swimming Pool
Sensor
2 Cooling
230V
Solar
Cooling via
Heating Circuit
*
2
SF 2
Frost Protection,
Two Store,
Boiler Control
3 Store Top (A; B)
2
5
Cooling
Heating Circuit
230V
DHW Heating with
Separate Output
SF 3
Cooling,
Circulation,
Pump Control
3 Store Top (A; B) 2
DHW Back-up
heating
230V
Circulation
SF 3
Cooling,
DHW Back-up
Heating, Pump
Control
- Without Sensor
2
Circulation
Pump
230V
DH
Wat
er
Circulation with
Bath Button
*
4
SF 5 Heat Meter 1
D1 Bathroom Button
-
-
Boiler Control for
DHW and Heating
V
SF 2
Frost Protection,
Two Store,
Cooling via
Heating Circuit
8
3
Boiler Sensor
Store Top (A; B)
8 Boiler Control
0-
10V
Bo
il
er
Pump Control for
Boiler and Store
V
SF 3
Cooling,
Circulation,
DHW Back-up
Heating
3 Store Top (A; B) 2
Boiler/ Store
Pump
230V
1 Heating Circuit /
Mixing Valve and
Pump Control
V
SF 4 1 Heat PI
6
7
Htg Flow Sensor
Ambient Air
Temp
5
6
7
Heating Pump
Mixing Vv Close
Mixing Vv Open
230V
Buffer Logic
V
AF 8
-
4
5
Buffer Top (C)
Buffer Bottom (D)
-
-
Hea
ti
ng
S
up
p
o
rt
Solid Fuel Boiler
SF 1
East-West, T-Pro,
Yield
Measurement
9
10
Solid Fuel Boiler
Store SFB (E)
4 Solid Fuel Boiler 230V
T-Pro
SF 1
East-West, Yield
Measurement,
Solid Fuel Boiler
9
10
T-Pro 1
T-Pro 2
4 T-Pro
230V
H
ea
t
Se
ns
in
g
Heat Meter 1
SF 5
Circulation/Bath
Button
D1 Heat Meter 1
-
-