![Colorjet AURAJET II Series Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/colorjet/aurajet-ii-series/aurajet-ii-series_installation-and-troubleshoot-manual_2637906008.webp)
Page | 7
AuraJet Series II
4. Electrical Requirements
Before installing the printer, the below mentioned electrical requirements should be confirmed:
•
Printer requires a single phase power and a good dedicated ground connection
•
Ground resistance should be less than 10 Ω
•
Power supply range should be 220V voltage (± 10%) and AC 50Hz or 60Hz
•
Power should be uninterrupted and is 3.5 kilowatt
•
Power outlets are required 6 AMP (includes Print engine, inbuilt heaters, extended heater, and take-up)
Note
: Power cords are packed with printer box.
5. Preparation before Installation
To install the printer, you must follow the below mentioned instructions for better use and long life of the printer:
•
Prepare the site as per the requirements like environmental temperature.
•
Configure PC as per the given system specification viz. RAM, operating system, processor, and storage
space.
•
Arrange the machine handling tools to avoid delays like a forklift.
•
Install the Printer Manager software by following all the instructions mentioned in the Installation Guide.
•
If any damage in packaging is founded, then immediately report the same to the dealer.
•
During the installation, it is preferable that at least two operators are present for training, who have
proficient computer skills and printing experience.
•
Keep the consumables like media and inks ready in advance to avoid any delay in installation.
•
While assembling, check the labels on the box "right and left" and
“front and rear”.
Содержание AURAJET II Series
Страница 1: ......
Страница 18: ...Page 17 AuraJet Series II Step 17 Install the sublimation kit If applicable as shown below...
Страница 79: ......