Power up
5-4
Chapter 5: Power and startup
98-148248-A
5.3.3
Initialisation steps in daily use
Once the system is configured and a satellite profile is active, the startup sequence is as
follows:
• ACU POST
• ADU Initializing
• ADU SW upload (If the software versions in the ADU and ACU are not the same, a
software update is done during startup.)
• ADU POST
• READY
• POINTING ANTENNA
• ACQUIRING SIGNAL
• TRACKING
5.3.4
SAILOR 600 VSAT Ka operational
When the display shows
TRACKING
.
MDM: NETOK
and the LED
Logon
is steady green
the system is operational.
Figure 5-3: ACU display, system operational
0DLQ1$9*+0'01(72./$1±
75$&.,1*
6$7:5;/+7;0$5
SAILOR600Ka-IM-98-148248.book Page 4 Monday, November 23, 2015 1:36 PM
Содержание SAILOR 600 VSAT Ka
Страница 1: ...SAILOR 600 VSAT Ka Installation manual...
Страница 8: ...vi 98 148248 A SAILOR600Ka IM 98 148248 book Page vi Monday November 23 2015 1 36 PM...
Страница 14: ...Table of contents xii 98 148248 A SAILOR600Ka IM 98 148248 book Page xii Monday November 23 2015 1 36 PM...
Страница 164: ...CE R TTE E 2 Chapter E Approvals 98 148248 A SAILOR600Ka IM 98 148248 book Page 2 Monday November 23 2015 1 36 PM...
Страница 177: ......
Страница 178: ...98 148248 A www cobham com satcom...