Installation of the ADU
98-148248-A
Chapter 3: Installation
3-17
Installation
5. Attach two tag lines of suitable length to the harness and man them.
6. With a crane lift the ADU off the packaging and move it on top of the mast. Maintain
vertical orientation of the ADU center line
.
7. Install the ADU on the mast flange with 4 M10 bolts and washers.
Tightening torque value: 30 Nm.
Always use
all 4 bolts
when installing the ADU.
8. Read carefully and follow instructions given in the next section on grounding.
Figure 3-15: ADU installation, 4 lifting straps on crane hook
SAILOR600Ka-IM-98-148248.book Page 17 Monday, November 23, 2015 1:36 PM
Содержание SAILOR 600 VSAT Ka
Страница 1: ...SAILOR 600 VSAT Ka Installation manual...
Страница 8: ...vi 98 148248 A SAILOR600Ka IM 98 148248 book Page vi Monday November 23 2015 1 36 PM...
Страница 14: ...Table of contents xii 98 148248 A SAILOR600Ka IM 98 148248 book Page xii Monday November 23 2015 1 36 PM...
Страница 164: ...CE R TTE E 2 Chapter E Approvals 98 148248 A SAILOR600Ka IM 98 148248 book Page 2 Monday November 23 2015 1 36 PM...
Страница 177: ......
Страница 178: ...98 148248 A www cobham com satcom...