Installation check list: ACU and modem, connectors and wiring
98-148248-A
Chapter 7: Installation check
7-3
Install
ation check
7.2
Installation check list: ACU and modem,
connectors and wiring
Step
Task
Verification and further information
Done
1.
Check that the ACU is grounded correctly,
using the mounting bolts and washers.
and
2.
Make sure you strain relieved the cables at the
ACU.
3.
Make sure that the modem is mounted close
to the ACU (preferably next to it).
Visual inspections.
4.
Check that the ADU antenna N-connector is
properly connected with the 50 Ohm RF
cable.
Visual inspection of the cover plate at the
bottom of the ADU. See section
5.
Check that the ACU antenna N-connector is
properly connected with the 50 ohm RF cable.
Visual inspection of the connector panel of
the ACU.
6.
Check that the ACU's
Rx Out
is connected to
the modem
Rx in
using the included 1 m F-F
75 ohm cable.
Visual inspection of the connector panel of
the ACU and the modem. See the figure
connect the ADU, ACU and modem
7.
Check that the ACU's
Tx In
is connected to
the modem
Tx out
using the included 1 m F-
F 75 ohm cable.
Visual inspection of the connector panel of
the ACU and the modem. See the figure
connect the ADU, ACU and modem
8.
Check that the ACU's
RS-232
is connected to
the modem using the included serial cable.
Visual inspection of the connector panel of
the ACU and the modem. See the figure
connect the ADU, ACU and modem
9.
Check that the ACU's
RS-232
is connected to
the modem using the included serial cable.
Visual inspection of the connector panel of
the ACU and the modem. See the figure
connect the ADU, ACU and modem
10.
Check that the ADU's NMEA 0183 connector
is connected to the NMEA 0183 bus of the
vessel using the included multi-connector
Visual inspection of the connector panel of
the ACU connector. See Table 4-4 on page 4-
3.
11.
Measure that the power for the ACU has the
correct polarity in the power connector,
before connecting it to the ACU power input.
(V
in
+: left, V
in
-: right).
Use a volt meter. See Table 4-1:
plug, outline and pin assignment
12.
Check that the AC power cable is plugged into
the modem and that AC power is available.
Visual inspection.
Table 7-2: Installation check list: ACU, connectors and wiring
SAILOR600Ka-IM-98-148248.book Page 3 Monday, November 23, 2015 1:36 PM
Содержание SAILOR 600 VSAT Ka
Страница 1: ...SAILOR 600 VSAT Ka Installation manual...
Страница 8: ...vi 98 148248 A SAILOR600Ka IM 98 148248 book Page vi Monday November 23 2015 1 36 PM...
Страница 14: ...Table of contents xii 98 148248 A SAILOR600Ka IM 98 148248 book Page xii Monday November 23 2015 1 36 PM...
Страница 164: ...CE R TTE E 2 Chapter E Approvals 98 148248 A SAILOR600Ka IM 98 148248 book Page 2 Monday November 23 2015 1 36 PM...
Страница 177: ......
Страница 178: ...98 148248 A www cobham com satcom...