Installation of the ADU
3-18
Chapter 3: Installation
98-148248-A
9. Remove the harness as shown in the following figure:
10. Locate the quick link (1) and open it (2).
11. Pull the strap with the quick link through the harness to remove it (3).
12. Slide the harness over the top of the ADU (4).
13. Dispose of the harness in a responsible manner.
14. Attach the N connector of the ADU cable to the ADU.
15. Ensure that the connector is properly protected against seawater and corrosion. As a
minimum, wrap it with self-amalgamating rubber.
16. Where the cables are exposed to mechanical wear – on deck, through bulkheads, etc. –
protect the cables with steel pipes. Otherwise, follow standard procedures for cabling in
ship installations.
Figure 3-16: Removal of the harness
Figure 3-17: Attaching the N connector
1
2
3
4
SAILOR600Ka-IM-98-148248.book Page 18 Monday, November 23, 2015 1:36 PM
Содержание SAILOR 600 VSAT Ka
Страница 1: ...SAILOR 600 VSAT Ka Installation manual...
Страница 8: ...vi 98 148248 A SAILOR600Ka IM 98 148248 book Page vi Monday November 23 2015 1 36 PM...
Страница 14: ...Table of contents xii 98 148248 A SAILOR600Ka IM 98 148248 book Page xii Monday November 23 2015 1 36 PM...
Страница 164: ...CE R TTE E 2 Chapter E Approvals 98 148248 A SAILOR600Ka IM 98 148248 book Page 2 Monday November 23 2015 1 36 PM...
Страница 177: ......
Страница 178: ...98 148248 A www cobham com satcom...