Site preparation
98-148248-A
Chapter 3: Installation
3-7
Installation
3.2.5
Ship motion and offset from the ship’s motion centre
When installing the ADU you must consider the mounting height carefully. The higher up
the ADU is mounted, the higher is the linear g force applied to the ADU. The g force also
depends on the roll period of the ship, see Table 3-1. If the g force applied is too high,
performance and ADU signal stabilization may be reduced and eventually the ADU may be
damaged. See the following table for allowed mounting heights above the ship’s motion
centre.
Even though it is recommended to mount the ADU high, keep the distance between the
ADU and the ship’s motion centre as short as possible.
Figure 3-5: Maximum distance from the ship’s motion centre (h max)
Min.
roll period
Maximum antenna mounting height (h max)
Full performance
Potential risk of damage
4 s
12 m
16 m
6 s
27 m
35 m
8 s
48 m
62 m
10 s
75 m
98 m
Table 3-1: Maximum distance from the ship’s motion center versus
ship’s roll period
KPD[
SAILOR600Ka-IM-98-148248.book Page 7 Monday, November 23, 2015 1:36 PM
Содержание SAILOR 600 VSAT Ka
Страница 1: ...SAILOR 600 VSAT Ka Installation manual...
Страница 8: ...vi 98 148248 A SAILOR600Ka IM 98 148248 book Page vi Monday November 23 2015 1 36 PM...
Страница 14: ...Table of contents xii 98 148248 A SAILOR600Ka IM 98 148248 book Page xii Monday November 23 2015 1 36 PM...
Страница 164: ...CE R TTE E 2 Chapter E Approvals 98 148248 A SAILOR600Ka IM 98 148248 book Page 2 Monday November 23 2015 1 36 PM...
Страница 177: ......
Страница 178: ...98 148248 A www cobham com satcom...