
Installation & Setup
Roadster & Mirage S+/HD User Manual
2-27
020-100002-04 Rev. 1 (12-2008)
Figure 2.37. Joining All Networks
To isolate just RS422 communications, select “RS232 and Ethernet Joined”. In
Figure 2.37, only projector #3 will respond to the RS422 controller. To isolate just
Ethernet communications, select “RS232 and RS422 Joined”—only projector #1 will
respond via Ethernet.
The North American rated line cord is provided with each projector. Ensure
that you are using a line cord that meets the appropriate rating standards.
Plug the projector’s high-current line cord into the line input socket located in the
lower right corner of the rear panel of the projector, then plug the 3-pronged end of
the line cord into a grounded AC outlet. Ensure the socket outlet is installed near the
equipment and is easily accessible. Input voltage to
all Roadster and Mirage
models
must be capable of
200
–
240
VAC.
Use the proper power source and the high-
current rated line cord provided.
See
Section 6, Specifications
for all power
requirements.
WARNING
Do not attempt operation if the AC supply and cord are not
within the specified voltage and power range.
Caution for Shutdowns:
Once the projector is turned off (
), the lamp
cooling fans will continue to run for approximately five minutes to ensure that the
projector and lamp have sufficiently cooled, at which point the fans will
automatically shut off. To avoid thermal stress that can lead to premature lamp
failure,
never
unplug the line cord while the lamp cooling fans are running, and
never
unplug to power down.
2.7 Power
Connection