VERIFICATION PROCEDURE
42
IMPORTANT:
For every replacement of a Chattanooga® Revolution Wireless unit (remote control, module, docking station),
a verification procedure must be applied. The verification procedure depends on the replaced unit of the device.
For the verification procedures, use all the units available that are going to be returned to the customer. Use only the units
of the Wireless Professional device functional complete set if the customer kept some units of his own set.
Visual inspection procedure
After every verification procedure or before sending any device or accessory to the customer, a “VISUAL PROCEDURE” must
be applied. The “VISUAL INSPECTION” is part of the “VERIFICATION PROCEDURE” chapter.
REMOTE CONTROL AND
MODULE INTERACTION
DOCKING STATION
FUNCTIONALITIES
Replaced unit
Verification
procedures
REMOTE CONTROL AND
MODULE INTERACTION
DOCKING STATION
FUNCTIONALITIES
DOCKING STATION
FUNCTIONALITIES
Figure 11 : Verification procedure process