22
Part 2:
INSTALLATION
2.10.1 Models UH-200B, UH-200
(continued from previous page)
To install the detergent pump (continued):
6. Connect the detergent tubing from the outlet of the pump to the 90
°
fitting
7. Connect the pump motor wires to the harness wires supplied in the installation kit.
8. Refer to Fig. 2.10.2 below.
Connect the wiring harness to the 10 pin terminal block located on the lower right side of
the machine. Connect the #2 harness wire to the Common (#2) terminal on the block.
Connect the #24 wire to the Detergent #24 terminal on the block.
9. Refer to Section 2.9.2, page 19, for pump priming and adjustment procedures.
10. Check all connections for leaks.
11. Installation is complete.
4-10
H04
Figure 2.10.2
Chemical Pump Connection Terminal Block
(Lower right side of machine base)
If you are installing pumps not
supplied by Champion then the
chemical connection points are
limited to 2 AMP maximum.
2 AMP maximum amp load per pump;
6 AMP total amp load.
PUMP
MOTOR
Common
To
Terminal
Block
Harness #2
Harness # x
Hot
# x =
Detergent #24
Rinse aid
#25
Sanitizer
#26
26
25
24
2
2
26
25
24
2
2
2
2
4
DET
R/A
SANI
COM
COM
COM
24
25
26
2
2
2
6
6
54
54
4
!!ATTENTION INSTALLER!!
Содержание UH-200
Страница 109: ...108 Part 9 REPLACEMENT PARTS Figure 9 4 Door and Door Safety Switch Assembly All Models 1 2 3 4 4 5 6 7 8 9 7 6 10 11 ...
Страница 117: ...116 Part 9 REPLACEMENT PARTS Figure 9 8 Spray Arm Assembly UH 200B UH 200 Upper Spray Arm Assembly 1 2 2 6 7 8 3 4 5 5 ...
Страница 123: ...122 Part 9 REPLACEMENT PARTS Figure 9 11 Wash Pump Motor Assembly All Models 12 13 1 2 3 5 4 6 7 8 9 10 14 11 ...
Страница 127: ...126 Part 9 REPLACEMENT PARTS Figure 9 13 Solid State Controls All Models ...
Страница 135: ...134 Part 9 REPLACEMENT PARTS Figure 9 17 Dishracks Line Strainer PRV All Models 2 3 4 1 ...