6.11 P
ERFORMING
A
S
YSTEM
T
EST
When finished, the main menu will display a message saying
Machine Setup Not Completed. Machine Is Not Ready To Run.
Contact Your Dealer
as shown below.
At this point you will need to run the
System Test
, which ensures that:
•
The Home Switch is not set too close to the index pulse of the motor's encoder.
•
The software travel limits are within the physical hard limit.
Documentation on how to perform a system test is located here:
(
https://www.centroidcnc.com/downloads/Systemtest.pdf
)
6.12 C
REATE
A R
EPORT
1. From the main menu press
F7 Utility
→
F7 Create Report
→
F10 Accept
2.
Save The report somewhere safe.
A usb stick or an external hard drive is a good place to save the backup.
3. Send the
Report.zip
to
Figure 6.11.1
Machine Requiring a System Test
Содержание 13126
Страница 1: ...CENTROID Oak Board Install Manual Last revised 6 3 2021 Page 1 of 86...
Страница 10: ...1 3 OVERVIEW Page 10 of 86 Chapter 1 What s included...
Страница 22: ...Page 22 of 86 Chapter 3 Software Installation...
Страница 41: ...Page 41 of 86 Electrical Cabinet Wiring Figure 5 8 1 Sample VFD Wiring...
Страница 42: ...Page 42 of 86 Electrical Cabinet Wiring Figure 5 8 2 Spindle Wiring...
Страница 63: ...APPENDIX B TECHNICAL INFORMATION...
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ...APPENDIX C 3RD PARTY DRIVE CABLE INFORMATION Yaskawa Drives Page 83 of 86 Appendices...
Страница 84: ...Delta Drives Page 84 of 86 Appendices...
Страница 85: ...Estun Pronet Series Page 85 of 86 Appendices...
Страница 86: ...Flying Lead Cable Page 86 of 86 Appendices...