5.8 W
IRING
S
PINDLE
STOP:
Before wiring up the spindle make sure that the analog output was tested as directed in Section 4.1.9.
There are two methods of wiring a spindle:
•
Reversing Contactors:
(logic connections shown in Figure 5.8.2, power connections in 5.8.3)
The 3 phase is connected to mechanically interlocked reversing contactors, controlled by outputs 7 and 8 on the Oak
board.
•
Variable Frequency Drive (VFD):
(shown in Figure 5.8.1)
The terms “inverter”, “AC Drive”, and “VFD” (Variable Frequency Drive) can all refer to the spindle controller. Centroid has
Technical Bulletins for the following drives:
1) Delta VFD-B:
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/182.pdf
2) Delta VFD-V:
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/183.pdf
3) Delta VFD-VE:
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/250.pdf
4) Delta VFD-VE (V2):
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/229.pdf
5) Automation Direct GS3:
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/203.pdf
6) Automation Direct GS2:
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/209.pdf
7) Yaskawa VS-616G3:
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/255.pdf
8) Yaskawa VS-606V7:
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/256.pdf
9) Control Techniques SP:
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/278.pdf
A general guide on VFDs is in TB 152:
http://www.centroidcnc.com/dealersupport/tech_bulletins/uploads/152.pdf
The max and min spindle speed set up in Section 4.1.3 as well as the spindle analog range need to match the inverter settings. If
this is different than 3000 rpm and 0 to +10 VDC, they need to be changed.
With the default PLC program, several of the I/O are used with a spindle:
Oak Input/Output
Function
Input 10
Fault input from spindle controller
Output 5
Fault reset to spindle controller
Output 7
Fault output to spindle controller
Output 8
Spindle direction
Output 10
Cooling fan
Always refer to the schematic that came with the system.
In the example below the thermal overload protector is wired directly to the spindle fault. If your spindle controller has a fault
condition it should be wired in series with the thermal overload protector.
All contactors
need
snubbers. Centroid recommends using the Quencharc snubber (Centroid PART# 1819) on the coil of the
contactor. This reduces electrical noise when the spindle is turned off and on.
Enabling Spindle Fault Inputs:
1. Power up your system.
2. Start CNC12 and press F10 to continue to the main screen.
3. In the main menu press alt + I to bring up the real time I/O display.
4. Navigate to Input 10.
5. Press the ctrl-alt-i keys to remove any bars over the input.
Page 40 of 86
Chapter 5 Electrical Cabinet Wiring
Содержание 13126
Страница 1: ...CENTROID Oak Board Install Manual Last revised 6 3 2021 Page 1 of 86...
Страница 10: ...1 3 OVERVIEW Page 10 of 86 Chapter 1 What s included...
Страница 22: ...Page 22 of 86 Chapter 3 Software Installation...
Страница 41: ...Page 41 of 86 Electrical Cabinet Wiring Figure 5 8 1 Sample VFD Wiring...
Страница 42: ...Page 42 of 86 Electrical Cabinet Wiring Figure 5 8 2 Spindle Wiring...
Страница 63: ...APPENDIX B TECHNICAL INFORMATION...
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ...APPENDIX C 3RD PARTY DRIVE CABLE INFORMATION Yaskawa Drives Page 83 of 86 Appendices...
Страница 84: ...Delta Drives Page 84 of 86 Appendices...
Страница 85: ...Estun Pronet Series Page 85 of 86 Appendices...
Страница 86: ...Flying Lead Cable Page 86 of 86 Appendices...