
23
ENG
Heos BOX R704
+0300140EN - rel. 1.0 - 25.05.2022
Caution:
the refrigerant connections must always be completed by
qualified personnel who have the qualifications and authorisations
required by local regulations, using appropriate personal protective
equipment (PPE), who are aware of the necessary precautions and who are
able to correctly and safely complete all required operations.
Residual risk of expulsion of pressurised fluids/bursting of equipment
if the instructions regarding the maximum pressure limits in the low
pressure circuit are not observed when checking for leaks with nitrogen
following welding on site.
Caution:
before charging the refrigerant circuit with nitrogen to
check for leaks or charging the refrigerant, check that the safety valve
outlet is correctly piped to an area where there are no residual safety risks
to people or objects.
Caution:
the refrigerant circuit compartment closing panel is
connected to the rest of the structure by an earth wire (yellow/green). If
this wire is removed during installation, before closing the panel make sure
to connect it again, to ensure earth continuity between the panels.
4.5 Electrical connections
Caution:
the electrical panel closing panel is connected to the rest
of the structure by an earth wire (yellow/green). If this wire is removed
during installation, before closing the panel make sure to connect it again,
to ensure earth continuity between the panels.
HB200C0300CE0
HB200C0400CE0
HB200C0600CE0
HB200C1000CE0
Cable siz
e
Power supply
3G16
3G16
3G25
3G16
Lights
3G1
3G1
3G1
3G1
Curtain
4G1
4G1
4G1
4G1
Anti-sweat
3G1
3G1
3G1
3G1
Evaporator fan
3G1
3G1
3G1
3G1
Defrost
3G1
3G1
3G1
3G1
Tab. 4.c
4.9.1 Electrical panel inputs/outputs
Refer to the wiring diagram supplied with the Heos Box and the table
below for correct connection of the inputs and outputs to the Heos Box
electrical panel.
The mains power disconnect device must have a contact opening
distance that allows complete disconnection in overvoltage category III
conditions; it must also be incorporated into the HEOS BOX power supply
line in accordance with national regulations. It is compulsory to follow the
instructions on the wiring diagrams and comply with the minimum sizes
of the multi-core cables shown in the table below before connecting the
devices managed by the electrical panels.
I/O label
I/O interface description
Reference
in figure 2.j
Location of the cable ends
inside the electrical panel
Description of the function
Power supply
M32 x 1.5 cable gland
46
Disconnect switch
Heos Box power supply
Probes
Multi hole cable gland, M25 x 1.5
50
Electronic controller, terminal J5, channel U5
Air inlet probe
Electronic controller, terminal J4, channel U3
Air outlet probe
Electronic controller, terminal J4, channel U4
Defrost probe
Electronic controller, terminal J5, channel U6
Superheat probe (for multi-evap.)
Expansion valve M25 x 1.5 cable gland
59
Electronic controller, terminal J19
Expansion valve
Dig. out 1
M20 x 1.5 cable gland
54
Electronic controller, terminal J8
Light
Dig. out 2
M20 x 1.5 cable gland
55
Electronic controller, terminal J9
Night blind
Dig. out 3
M20 x 1.5 cable gland
49
Auxiliary terminal 3 and 4 for optional anti-sweat
heater kit (position 38 in Fig. 2.j
Rail heater
Dig. out5
M20 x 1.5 cable gland
48
Electronic controller, terminal J12
Evap. Fan
Dig.out6
M20 x 1.5 cable gland
47
Electronic controller, terminal J13
Defrost
Supervision
M20 x 1.5 cable gland
51
Electronic controller, BMS serial port J14
WiFi gateway or supervisory system
Fieldbus
M20 x 1.5 cable gland
52
Electronic controller, Fieldbus J15
Main / secondary EP
-
RJ45 connector
60
Electronic controller, terminal J17 (already wired)
BCU terminal
Ethernet
M20 x 1.5 cable gland
53
Electronic controller, terminal J20
Ethernet LAN (for supervisor)
Free 1
4 hole cable gland, M25 x 1.5
58
Can be used for example for digital inputs, digital output 4 (1) or analogue outputs of
electronic controller.
Free 2
M20 x 1.5 cable gland
57
Free 3
M20 x 1.5 cable gland
56
Tab. 4.d
Notice:
Terminal J11 of the electronic control. Refer to Table 2.h for
the sizing of any electrical load associated with this digital output.
Position 42 in Fig 2.j shows the earthing points for the main power
supply and for the digital outputs (see the main figure with all the
components).
Содержание HB200C0300CE0
Страница 2: ......
Страница 4: ......
Страница 30: ...30 ENG Heos BOX R704 0300140EN rel 1 0 25 05 2022 Notes...
Страница 31: ......