
● SSSW-SW04
Functional Construction
Bit
Function
1
0
0
LC monitoring
Monitor
Do not monitor
1
Check the CI signal frequency
Check
Do not checked
2
Final flag sequences of the procedure signal
2 pcs
1 piece
3
Reception mode after sending CFR signal
High speed
High speed/low speed
4
Time to ignore low-speed signals after sending CFR signal
1500 msec
700 msec
5
Check the CS signal frequency (when PBX is set)
Check
Do not check
6
CNG signal at the time of manual sending
Send
Do not send
7
CED signal at the time of manual reception
Send
Do not send
Detailed Discussions of Bit 1
Select whether to check the CI signal frequency.
Detailed Discussions of Bit 2
Select the number of the final flag sequences with the procedure signal (300 bps transmission speed).
Select "2" when the other party's machine does not properly receive the procedure signal sent by this machine.
NOTE:
Error codes occurring at the time of sending fax
##100, ##280, ##281, ##750, ##753, ##754, ##755, ##758, ##759, ##760, ##763, ##764, ##765, ##768, ##769, ##770, ##773,
##775, ##778, ##780, ##783, ##785, ##788
Detailed Discussions of Bit 3
Select a reception mode after sending CFR signal.
Select "High speed" in the case of frequent errors caused by line condition at the time of reception. Simultaneously, turn
"OFF" the "ECM reception" of the user data.
NOTE:
Error codes caused by line condition at the time of reception
##107, ##114, ##201
Be sure to change bit 4 before changing this bit; if errors still occur, change this bit.
When 'high speed' is selected, only high-speed signals (images) will be received after sending the CFR signal.
Detailed Discussions of Bit 4
Select the time length during which low-speed signals are ignored after sending the CFR signal.
Select "1500 msec" when reception of image signal is difficult because the line condition is not good.
Detailed Discussions of Bit 5
Select whether to check the CI signal frequency when PBX is set.
Detailed Discussions of Bit 6
Select whether to send CNG signal at the time of manual sending.
If error occurs frequently at manual sending when the destination device that has FAX/TEL switch mode does not change
to the fax mode, select "Send".
Detailed Discussions of Bit 7
Select whether to send CED signal at the time of manual reception.
Select "Send" when the other party's machine does not start sending although manual reception is executed.
● SSSW-SW05
Functional Construction
Bit
Function
1
0
0
Not used
-
-
1
To execute mm/inch conversion (text mode).
Yes
No
2
Not used
-
-
8. Service Mode
964
Содержание imageRUNNER ADVANCE C3500 III Series
Страница 1: ...Revision 2 1 imageRUNNER ADVANCE C3500 III Series Servie Manual ...
Страница 23: ...Safety Precautions Laser 2 Power Supply Lithium Battery 3 Toner Safety 4 Notes on works 4 ...
Страница 28: ...Product Overview 1 Product Lineup 7 Specifications 11 Parts Name 34 ...
Страница 153: ...Periodical Service 3 Consumable Parts List 132 Cleaning Parts 136 ...
Страница 158: ...Cleaning Parts 15 9 14 13 8 4 16 17 5 3 6 7 1 2 12 10 11 15 16 3 Periodical Service 136 ...
Страница 210: ... Procedure 1 Remove the 4 cables 4 Connectors 1 3 Wire Saddles 2 3x 4x 1 1 2 2 4 Parts Replacement and Cleaning 188 ...
Страница 211: ...2 Remove the HDD Unit 1 3 Hooks 2 1 Screw 3 1x 2 2 3 4 Parts Replacement and Cleaning 189 ...
Страница 249: ...2 3 1x 4 Parts Replacement and Cleaning 227 ...
Страница 293: ...Adjustment 5 Pickup Feed System 272 Document Exposure System 275 Actions after Replacement 277 ...
Страница 306: ...Troubleshooting 6 Initial Check 285 Test Print 286 Troubleshooting Items 291 Debug Log 304 ...
Страница 345: ...Error Jam Alarm 7 Outline 324 Error Code 328 Error Code FAX 466 Alarm Code 469 Jam Code 517 ...
Страница 949: ...COPIER Service mode for printer COUNTER Counter mode LIFE DF PR PD 1 For R D 8 Service Mode 927 ...
Страница 1010: ...Super G3 FAX Board AZ1 1147 Super G3 2nd Line Fax Board AU1 1154 Cassette Heater Unit 41 1167 9 Installation 988 ...
Страница 1018: ...5 Remove the cushioning material from the copyboard section Model without DADF Model with DADF 9 Installation 996 ...
Страница 1025: ...4 NOTE The removed cover will be used in step 6 5 2x 2x 6 NOTE Use the cover removed in step 4 9 Installation 1003 ...
Страница 1029: ...1 2 2x 3 4 NOTE The removed CR BOX Upper Unit will be used in step 14 9 Installation 1007 ...
Страница 1033: ...13 NOTE Usethe Base Small Cover removed in step 5 14 NOTE Use the CR BOX Upper Unit removed in step 4 15 9 Installation 1011 ...
Страница 1050: ...Installation Procedure Installing the Equipment 1 2 3 9 Installation 1028 ...
Страница 1052: ...8 Turn ON the main power switch 9 Installation 1030 ...
Страница 1055: ...3 4 CAUTION Be sure that the Inner 2 way Tray Support Member is installed properly 9 Installation 1033 ...
Страница 1063: ...2 2x 1x 3 1x 1x 1x 4 1x 1x NOTE The removed screw will be used in step 5 9 Installation 1041 ...
Страница 1065: ...6 CAUTION Be careful not to trap the cable when mounting the cover 1x 7 2x 9 Installation 1043 ...
Страница 1075: ... In the case of the Reversal DADF 1 2 3 NOTE The removed part will be used in step 8 9 Installation 1053 ...
Страница 1088: ...4 6x 5 4x 6 7 NOTE Do not close the Wire Saddle 1x 8 9 Installation 1066 ...
Страница 1090: ...12 NOTE Be sure to adjust the number of cushions according to the thickness of the Card Reader 13 9 Installation 1068 ...
Страница 1091: ...14 15 16 17 2x 18 9 Installation 1069 ...
Страница 1103: ...3 CAUTION Install the CC VI Cable in the direction shown in the figure 2x 1x Installing the Covers 1 1x 9 Installation 1081 ...
Страница 1104: ...2 2x 3 Connect the power plug to the outlet 4 Turn ON the power switch 9 Installation 1082 ...
Страница 1111: ...5 CAUTION To avoid damage do not pull the Utility Tray too much 6 2x 2x TP M4x8 Black 9 Installation 1089 ...
Страница 1112: ...When Installing the USB Keyboard 1 9 Installation 1090 ...
Страница 1114: ...Installation Procedure Removing the Covers 1 2x 2 1x 3 2x 9 Installation 1092 ...
Страница 1115: ... Installing the Removable HDD Kit 1 2 3x 4x 9 Installation 1093 ...
Страница 1119: ...11 12 1x 13 NOTE Use the screw removed in step 3 1x 9 Installation 1097 ...
Страница 1120: ...14 3x 4x Installing the Covers 1 2 2x 3 1x 9 Installation 1098 ...
Страница 1123: ...Installation Procedure Removing the Covers 1 2x 2 1x 3 2x 9 Installation 1101 ...
Страница 1124: ... Installing the 2 5inch 1TB HDD 1 3x 4x 2 1x NOTE The removed screws will be used in step 7 9 Installation 1102 ...
Страница 1127: ...8 3x 4x Installing the Covers 1 2x 2 1x 9 Installation 1105 ...
Страница 1134: ...2 On the screen shown below press Change and then Detailed Settings 3 9 Installation 1112 ...
Страница 1140: ...Installation procedure Remove the Control Panel 1 2 2x 3 4 2x 5 2x 9 Installation 1118 ...
Страница 1141: ...6 2x 7 4x 8 3x 9 10 9 Installation 1119 ...
Страница 1142: ...11 12 6x 13 2x 14 9 Installation 1120 ...
Страница 1143: ... Installing the NFC Kit 1 2 2x 3 1x TP M3x4 4 1x 9 Installation 1121 ...
Страница 1144: ... Installing the Control Panel 1 2 2x 3 6x 4 9 Installation 1122 ...
Страница 1145: ...5 6 3x 7 4x 8 2x 9 10 2x 9 Installation 1123 ...
Страница 1146: ...11 2x 12 13 2x 14 9 Installation 1124 ...
Страница 1154: ...14 4x Installing the Relay PCB 1 1x 1x TP M3x6 1x 2 1x 1x 9 Installation 1132 ...
Страница 1155: ...3 4 2x 3x 5 4x 6 9 Installation 1133 ...
Страница 1162: ... Installing the Relay PCB 1 1x 1x TP M3x6 1x 2 1x 1x 9 Installation 1140 ...
Страница 1163: ...3 4 2x 3x 5 4x 9 Installation 1141 ...
Страница 1166: ...1 CAUTION Do not insert the screwdriver into the hole when removing the cover 2 3 2x 9 Installation 1144 ...
Страница 1167: ...4 1x 5 CAUTION Be sure to install the Dehumidification switch in the correction direction 1x 9 Installation 1145 ...
Страница 1172: ... Installing the Covers 1 1x 2 NOTE Store the removed Face Cover in the Tray Guide in step 5 3 2x 4 9 Installation 1150 ...
Страница 1180: ...6 1x 7 8 5x M3x6 9 Installation 1158 ...
Страница 1192: ...5 CAUTION Be sure to release the lock and then disconnect the FCC Connector 1x 6 7 9 Installation 1170 ...
Страница 1193: ... Installing the Cassette Heater 1 2 3 In the case of Host machine TP Round End M3x6 1x 9 Installation 1171 ...
Страница 1200: ...2 3 2x 4 1x 9 Installation 1178 ...
Страница 1201: ...5 CAUTION Be sure to install the switch in the correction direction 1x 6 2x 9 Installation 1179 ...
Страница 1202: ...7 8 9 Connect the power plug of the host machine to the outlet 10 Turn ON the main power switch 9 Installation 1180 ...