47
25. Commissioning report
Page
1
Commissioning report
plant operator
surname
ad
dress
postcode / location
heating insert
Basic stove combustion
chamber
Facility data
device type
marking
Schmid
AB-
number
downstream connection
(m)
coasters
ceramic flue gas ducts
attachments storage
heating flap
specialist
surname
address
postcode / town
fireplace insert
serial number
Type
length
Type
Others
Chimney / connecting cable
connecting line
(mm)
(m)
chimney
(m)
(mm)
diameter
extended length
deflections
effective height
diameter
single shell
more shells
Outer wall (stainless steel)
Combustion air supply
operation
combustion air line
room air composite
f
irmly connected
not installed
room air dependent (combustion air duct sealed off to the convection area)
room air dependent (combustion air duct is located in the convection area)
outside air connection with connection piece connected to the device diameter
diameter
(mm)
extended length
(m)
Ventilation system (controlled ventilation, extractor hood, etc.)
during commissioning
no facility available
Plant available
safety device
unavailable
available / type
available / type
control engineering
combustion control
further regulations
unavailable
Water regulation / type
Others
Yes
Yes
Briefing and delivery
The plant operator was briefed on the operation and maintenance of the plant.
The plant operator was informed of dangers during the operation of the plant
.
The plant operator was given the installation and operating instructions
.
Yes
place
date
Signature plant operator
Signature specialist company