16
not begin heating until the fuel has nearly burned down
completely. Use the maximum combustion air setting
(cold start/heat-up). Carefully wipe off any condensation
which forms on the masonry stove or on the cladding
immediately before residues can burn into the
surface coating. Provide for sufficient ventilation of the
installation room during this phase.
A newly built stove system must never be used for
dry-heating of living rooms.
12. Handover to owner
Instruct the owner on the operation and maintenance
of the furnace system. Hand over the operating
instructions for all installed parts (e.g. controller etc.) to
the owner following instruction.
Hand over one or, if necessary, several commissioning
reports etc. to the owner.
Produce a handover log and list all documents handed
over and the instruction of the owner carried out in it.
A report is provided on the last page for removal.