20
16. Delivery Scope
Contained in delivery scope:
•
Small installation accessories
•
Repair compound
•
Acrylic adhesive/natural stone adhesive
•
System parts
•
Installation and operating instructions
•
Ceramic tape
•
Sealing tape
•
Adhesive for sealing tape
•
Pipe expander, Ø 150 mm to Ø 160 mm
(only in wall connection set).
•
Ronda GO 4557 with Front Kristall
•
Rotary chimney
We recommend dry installation for checking the exact fit
of all components and of all parts relative to the spatial situation in advance.
The first installation steps are identical for the S21 GO-Line heat storage system wall
and ceiling connection variant and are described in the following chapter.
18. Installing S21 GO-Line heat storage system
18.1 Starting installation of S21 GO-Line heat storage system for
wall and ceiling connection
17. Required materials
Required materials:
•
Tape measure
•
Angle
•
Level
•
Spatula
•
Container for mixing repair compound
•
Angle grinder (with grinding wheel for stone)
•
Connecting tube for connection to the
chimney
•
Cartridge gun
•
Allen key set, 2.5 mm/4 mm/5 mm
•
Flat-blade screwdriver
•
Spanner, 24 mm
1. Align the floor panel in the desired position on the
floor.
•
Distance to rear wall = 10 cm
•
Distance from wall to side wall = 10 cm.
•
Distance to ceiling = 20 cm.
•
Distance within radiation zone of viewing window
pane = 80 cm
2. If the supply air is not routed from below through
the floor panel, then please insert the included inlay
cover in the opening.