6
3.1.2 Fuels
The masonry stoves may only be operated with air-
dried logs with a maximum residual moisture of 20 %
or pressed pellets made of natural wood according to
the standard DIN 51731. The use of other fuels is not
permitted.
3.1.3 Combustion air supply
The masonry stoves are fireplaces dependent on room
air. An external combustion air supply may not be
modified. Make sure that all necessary combustion air
lines are open when the fireplace is in operation.
3.1.4 Connecting to the flue
The masonry stoves may only be operated when they
are connected to a chimney. The chimney connection
and the chimney openings must be executed in
accordance with the standard DIN V 18160 Part 1, of the
1st BlmSchV and local regulations and accepted by the
responsible regional chimney sweep.
3.1.5
Cleaning and servicing, troubleshooting
Cleaning and maintenance intervals must be complied
with and faults must be eliminated immediately. These
measures are part of proper use!
3.1.6 Operation with multiple connection
With multiple connection, the masonry stove may only
be operated with the filling doors closed. If the masonry
stove is not operating, all doors and adjustment devices
must be closed.
3.2 CE marking
Schmid masonry stoves comply with the European
guidelines and the supplementary national require-
ments. The CE marking verifies that the product
conforms with its declared output.
You can request this declaration of performance for
the product from: Camina & Schmid Feuerdesign und
Technik GmbH & Co. KG, Gewerbepark 18,
49143 Bissendorf, Germany,
e-Mail:
Internet:
www.camina-schmid.de
3.3 Product information
Detailed product information technical data of the
individual models, spare parts and accessories are
listed in the corresponding chapters of the documentation
and can be downloaded at our website.
Spare parts:
http://ersatzteile.schmid.st
Website:
www.camina-schmid.de
4. Preliminary remarks on planning
4.1 Installing a safe system
When installing the stove or heating system, be sure
to observe all national legal requirements, rules and
standards, as well as the installation instructions of
the components installed. The installer bears the sole
responsibility for the operation and safety of the stove or
heating system in its entirety!
4.2 Legal regulations
The planning, calculation and execution of the stove
or heating system must be carried out in Germany
according to the recognized technical rules of the
stove and air heating installers trade in their current
version (TR OL). For example, the requirements for the
materials and components to be used, as well as the
specifications for calculations and execution including
fire and heat protection, fuel gas channels, combustion
air supply, etc. are specified there. Otherwise, observe
the respectively applicable national regulations in the
country of installation.
The regulations of the district building code, the firing
ordinance and the administrative regulations applicable
at the installation site must be complied with. National
and local regulations must be met.
4.3 Materials and components
Materials and components (construction materials)
must be suitable for their intended purpose and
marked accordance with the district building code. The
components must meet requirements and comply
with the relevant DIN/EN standards. Materials
and components requiring approval as defined in
statutory regulations must be officially certified and
must comply with the approval conditions. Insulating
materials must correspond to the building materials