Chapter 8: Acceptance & Commissioning Procedures
Site Acceptance Checklist Notes
phn-3962 004v000
Page 8-8
•
Antenna labels - for link identity and bearing
•
ODU labels - for link identity, frequency, and polarization
•
Cat5/Fiber cable labels - for link identity, close to the ODU, switch, and either end of any joint
•
Switch labels - for link identity
Содержание PTP 820C
Страница 1: ...INSTALLATION GUIDE PTP 820C and PTP 820C Assured System Release 10 0 ...
Страница 8: ...Contents phn 3962 004v000 Page vi Scope 8 9 Commissioning Test 8 9 PTP 820 Commissioning Log 8 11 ...
Страница 29: ...Chapter 2 Product Hardware Description MultiCore Mediation Devices MCMD phn 3962 004v000 Page 2 5 Figure 5 OMT ...
Страница 31: ...Chapter 2 Product Hardware Description PoE Injector phn 3962 004v000 Page 2 7 Figure 7 PoE Injector Ports ...
Страница 33: ...Chapter 2 Product Hardware Description System Components phn 3962 004v000 Page 2 9 ...
Страница 193: ...Chapter 6 Installation Procedures per Configuration Type AFR 1 0 Hub Site phn 3962 004v000 Page 6 92 ...